10
MUL
TI V Split Rooftop Unit Installation Manual
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. “LG” is a registered trademark of LG Corp.
Required Tools (field provided)
• Level
• JIS screwdriver
• Electrical lineman pliers
• Electric drill
• Holesaw
• Drill
• R410A flaring tool set
• Tubing cutter
• Tube/pipe reamer
• Refrigerant gas-leak detector
• Thermometer
Required Parts (field provided)
• Pipes - vapor line and liquid line, with insulation
• 3/8” or 1/2” nuts, flat washers, and lock/split washers
• 3/8” or 1/2” threaded hanger rods
• Insulated drain hose
• Additional drain hose
• Connecting cable (power and control)
INTRODUCTION