79
August 2009 Plasma 50PS80
Z
Z
-
-
SUS PWB Adjustment
SUS PWB Adjustment
PREPARATION:
1) Pre-Heat unit for at least 10 Minutes before making adjustments.
2) Place unit into White Wash from the Customer’s Menu for all adjustments.
3) Be sure to use all adjustment values as indicated on the panel
voltage label in the upper right hand corner of the panel. (Example above)
PROCEDURE: (See preceding page for locations)
4) Place DC Volt meter on VZB TP
(Top of R457 to Chassis Gnd).
5) Adjust VZB (Z Bias) VR201 to match your
specific Panel’s voltage label.
Z-Bias
ADJ
VR201
Z-Bias TP
Top of R457 to
Chassis Gnd
Lower Right Side Of PWB
Содержание 50PS80 Series
Страница 18: ...18 August 2009 Plasma 50PS80 Remote Control Remote Control TOP PORTION BOTTOM PORTION ...
Страница 122: ...122 August 2009 Plasma 50PS80 Main PWB Main PWB Semiconductor Semiconductor Component Component Voltages Voltages ...
Страница 134: ...134 August 2009 Plasma 50PS80 Side Key Assembly Side Key Assembly c To Ft IR PWB P1 SW8 SW2 SW6 SW7 SW4 SW5 SW3 SW1 c ...
Страница 139: ...This concludes the Presentation Thank You End of Presentation End of Presentation ...