OPERATING INSTRUCTIONS

 

 
 
Before operating the lift gate, read and understand this manual and all urgent warning decals. 
 

Do not

 stand in front of the lift gate while unfolding or using the platform. 

 
With the gate in the over-the-road (stored) position, proceed with the following steps: 
 
1. 

To relieve the tension on the auto lock, push the up switch (the gate will go up), pull the handle 
to release the auto lock. 

2. 

Use the down switch to lower the lift until arms are parallel to the ground. 

3. 

Stand to the side of the lift gate.  Push the power in/out switch down.  Gate will run out.  Run 
the gate out until it stops and locks into its fully extended position. 

4. 

Unfold the ramp. 

 
To lower the platform, use the down switch only. 
 
To raise the platform, use the up switch only. 
 
To store the gate in the over-the-road (stored) position: 
 
1. 

Raise the platform off the ground until the arms are parallel to the ground. 

2. 

Fold ramp over. 

3. 

Raise locking bar handle and push the in/out switch upward.  Run the gate all the way under 
the trailer until the lift stops. 

4. 

Run gate up (use the up switch).  The auto lock will latch. 

5. 

Lower the gate using the down switch only until resting on the auto lock. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание TLS3510RL Hide-A-Way

Страница 1: ...510RL Hide A Way Trailer Side Gate LEYMAN MANUFACTURING CORPORATION 10335 Wayne Avenue Cincinnati OH 45242 1 866 LEYMAN 1 1 866 539 6261 513 891 6210 Fax 513 891 4901 www leymanlift com sales leymanli...

Страница 2: ...Toggle Switch or Walk Around Installation 11 12 Charge Line 13 Grounding Recommendations 14 Wiring Diagrams Circuit Breaker and Additional Options 15 16 Installation Adjustments 17 Installation of Saf...

Страница 3: ...3 GENERAL TERMINOLOGY...

Страница 4: ...SSURE 2500PSI Up Function 800PSI In Out Function OPERATION Power up Gravity down Power in out SERIAL _____________________________________________________ MINIMUM MOUNTING SPACE REQUIREMENTS MINIMUM S...

Страница 5: ...s where the lift gate will be installed Check the cross member material If the cross members are made of aluminum the aluminum conversion kit Option 133TLS must be ordered and used to mount the lift g...

Страница 6: ...minimum in order to yield 14 inches ground clearance for the gate If the measurement is more than 47 inches the amount in excess of 47 inches is the height of the spacer that must be added to the fou...

Страница 7: ...nterfere with movement of the platform Depending on the side door threshold the platform may not fill the gap between the floor and the platform There are three options to correct this 1 Notch the tip...

Страница 8: ...e the Out Stops mounted in the standard position Mount Outer Slide rail face fixed rail flush with the rub rail If the total floor thickness dimension is larger than 10 1 2 the Out Stops must be flipp...

Страница 9: ...r 4 three inch channels Spread the forks as wide as possible CAUTION Do not hit anything with the forks Clamp the unit to the forks using two 2 C clamps 3 Pick the unit up position it under the traile...

Страница 10: ...See the Installation Adjustments page for correct order and steps CAUTION Do not ride on the gate yet when only partially welded 8 Complete welding Weld all channels along both sides to all trailer cr...

Страница 11: ...11 TOGGLE SWITCH ELECTRICS INSTALLATION OPTION 182TLS...

Страница 12: ...12 WALK AROUND ELECTRICS INSTALLATION OPTION 183TLS DEUTSCH...

Страница 13: ...ning cable with loom clamps and self tapping screws to the I beams Loom Clamp Run the power line wire with wiring harness on lift gate The plug that is on the tractor must have a hot wire and ground w...

Страница 14: ...positive and one 1 negative both running to the tractor batteries The Maintenance Minder 2 Controller requires that a minimum of 8 volts be maintained under load in order for the TLS to operate NOTE...

Страница 15: ...15 CIRCUIT BREAKER WIRING DIAGRAM...

Страница 16: ...LIGHT AMBER LIGHT P46493 MUST BE CONNECTED FOR COMPLETE CIRCUIT TO FUNCTION PROPERLY FROM LIGHT HARNESS ASSY AMBER LIGHTS TWO HARNESSES WHITE BLACK RELAY P46487 CONNECTION USE LARGE BUTT CONNECTOR FOU...

Страница 17: ...ip of the platform turn the end in this moves the tip of the platform up unscrewing moves the tip of the platform down Make necessary adjustments Replace pins raise the platform up and check Repeat if...

Страница 18: ...SAFETY DECALS Apply decals in a prominent and easy to read location P55221 P55157 P55294 P55236 P55211 P55222 P55138 on rub rail of trailer Leyman Manufacturing will replace safety stickers at any ti...

Страница 19: ...ped to bottom of cross members with loom clamps Control wiring has been properly routed and secured Check operation of toggle switches or walk around if equipped Check operation of optional lights if...

Страница 20: ...ERIES Two 2 12 Volt DC Group 31 Heavy Duty Dual Purpose or AGM ELECTRICAL COMPONENTS CONNECTIONS Use Fluid Film Rust Corrosion Protection by Eureka except on Start Solenoid On Start Solenoid use Color...

Страница 21: ...3 Stand to the side of the lift gate Push the power in out switch down Gate will run out Run the gate out until it stops and locks into its fully extended position 4 Unfold the ramp To lower the platf...

Страница 22: ...iler can be moved 1 Remove the pump handle from the holder and insert into the hand pump socket 2 Raise the platform off the ground about 6 pump up down 3 Retract the gate disconnect the in out chain...

Страница 23: ...s 3 BEEPS Max Time Fault exceeded the maximum continuous run time allowed 4 BEEPS High Temperature Fault unit will not run until motor cools All faults signals will be repeated FOUR times except the S...

Страница 24: ...es the number during this maintenance interval and the set number when maintenance is due Motor ON total motor run time in minutes for this maintenance period Service Fault number of times gate was op...

Страница 25: ...cent period is the highest Screen shows Period of Lifts and Total Run Time in minutes Press MENU and ARROW DOWN three times MENU 4 LAST LIFT INFO Trouble Shooting Screen it records data that occurred...

Страница 26: ...26 WIRING HYD DIAGRAM MM2 TEMP SWITCH BUCHER POWER UNIT...

Страница 27: ...WN switch is pushed Use test light to check 4 Visually check Platform creeps down when DOWN function is NOT activated 1 Hydraulic leak 2 Defective piston seal in cylinder 3 C valve white wire or check...

Страница 28: ...____________ ____________________________________________________________ ____________________________________________________________ ____________________________________________________________ ____...

Отзывы: