background image

Dept 40 PANEL ASSEMBLY 
# HINGE/PAN:

 

3

   

 

HINGE 2:

 

19 9/16

Item 

UM         Qty 

 

 

BATCH 648292 - 2 

  

 2        EACH          1       LEVOLOR SHUTTER 

 

 

   

     3 1/2” ELLIPTICAL LOUVER

  

 

 

 

 

 

Color:

 

VANILLA

 

Width:

 

35 1/4 

   

Height:  

46 5/8

  

Mount:

 

INSIDE

 

Shutter Style: 

STANDARD

    

Panel Configuration:

 

LR

   

Frame Selection:

 

Z FRAME

  # 

of Frame 

Sides: 

4

  Frame Sides: 

4 SIDES - Left-Right-Top-Bottom Sill - 04-LRTBS

    

Total Number of Panels:

 

P2

 

 Panel Set #1:

 

2 PANELS - Left-Right-

LR 

Tilt Option:

 

CLEAR TILT SOLID

    

Divider Rail:

 1 

DIVIDER RAIL

     

Divider Rail #1 Type:

 

REGULAR

    

Divider Rail #1 Location:

 

24 

      

Hinges:

 

PAINTED FINISH

      

Panel Lock:

 

PANEL LOCK

     

Room Location: 

NOOK

      

Rail and Cap Selection

B2 B1

 

 

 

 

GETTING STARTED

CONTENTS

2

3

Shutters Installation  Manual

© 2021 LEVOLOR, Inc.

Shutters Installation  Manual

Thank you for purchasing LEVOLOR

®

 Shutters. With proper installation, operation, and care, your new shutters will 

provide years of beauty and performance. Please thoroughly review this instruction booklet before beginning installation.  
Please visit LEVOLOR.com/Shutters to view installation videos and Spanish translation.

INSTALLATION OVERVIEW

All frame styles and configurations follow the same basic installation process:
 

1.  Review the packing slip and product labels to identify your frame style and mounting application 

 

2.  Organize tools and components 

 

3.  Assemble the frame

 

4.  Fasten the frame in two points 

 

5.  Hang shutter panel(s) 

 

6.  Confirm the product is square / level

 

7.  Fasten the remaining screws into the frame 

 

8.  Finishing touches such as panel lock adjustment, screw caps and caulking 

STEP 1: REVIEW THE PACKING SLIP AND PRODUCT LABELS

Check the room location on the packaging slip, as it should match what was entered during time of order. Additionally,  
check for the following items, and make note of these selections, as it will affect further steps:

Record the Mount, Frame Style and number of T-Posts (if applicable), as it will be necessary for later steps in this guide.

Packing Slip Example:

Getting Started

 ....................................................................................................................................................3–4 

 

Installation Overview ........................................................................................................................................... 3 

 

Tools and Fasteners You May Need .................................................................................................................... 4 

 

Organize Parts and Components ........................................................................................................................ 4  

Standard Shutter Installation 

 ...........................................................................................................................5–9 

 

Assemble the Frame ............................................................................................................................................ 5 

 

Partially Fasten frame .......................................................................................................................................... 6 

 

Hang Panels ......................................................................................................................................................... 7  

 

Square & Level Panels ......................................................................................................................................... 7 

 

Fully Fasten Frame ............................................................................................................................................... 7  

 

Finishing Touches ........................................................................................................................................... 8–9

Additional Installation Instructions (if needed)

 ........................................................................................... 9–14 

 

T-Post Installation  .......................................................................................................................................... 9-10 

 

Motorized Shutter Set Up .................................................................................................................................. 11  

 

French Door Shutter Installation .......................................................................................................................12  

 

By-Pass Installation ............................................................................................................................................13

Troubleshooting

 ................................................................................................................................................15–17 

Cleaning & Care 

 ......................................................................................................................................................18 

Additional Information and Support

....................................................................................................................18 

 

Warranty  .............................................................................................................................................................18 

 

Customer Service Support ................................................................................................................................18 

This example shows the following:
 

• 

Width:

 35 

1

4

 in 

 

• 

Height:

 46 

5

8

 in    

 

• 

Mount:

 Inside 

            

 

• 

Frame: 

Z Frame 

 

• 

# of Frames:

 4 Sides  

 

 

• 

Room Location:

 Nook

Panel Label

Top Frame Label

 
 

SAM001         SM. TEST 

 

 

648292-2   1 of 1 

P.O SAMPLE:  

      

 

      Rm: - 6592 

W:  35 1/4    H: 46 5/8   

               

   (01) Panel 1 

Style : STANDARD 
        

WO-LN                           Pnis 

            Col 

                        Slat 

       

648292-2                     P2L                         

VANILLA                        4 1/2”

 
 

SAM001         SM. TEST 

 

 

648292-2   1 of 1 

P.O SAMPLE:  

              Rm: -                                                32767 

     

 

Z Frame - Top Frame 
        

WO-LN        Pnis 

Col 

Slat 

Size 

Cut 

     

 648292-2      P2

         VANILLA              4 1/2              13.1250             

45-45  

 

 

                    

PUNCH FRAME                        

Order 

number: 

648292

Number of 

Shutters

Line Number: 

2

PRODUCT LABEL

 

•  Each

 frame

 will be identified with a removable label. 

 

•  Match the 

line number of the frame to the line number of the panel.

 

•  Do not remove labels until product is installed. 

Содержание Shutters Remote Control

Страница 1: ...Tilt Bar Gear Closure System Motorization Barra de inclinaci n Sistema de cierre de engranajes Motorizaci n Shutters INSTALLATION OPERATION CARE INSTALACI N FUNCIONAMIENTO CUIDADO...

Страница 2: ...caps and caulking STEP 1 REVIEW THE PACKING SLIP AND PRODUCT LABELS Check the room location on the packaging slip as it should match what was entered during time of order Additionally check for the fo...

Страница 3: ...that an audible pop has occurred indicating the frames have been successfully secured Hold firmly until set 10 to 20 seconds Repeat for remaining corners Important It will be impossible to detach the...

Страница 4: ...rt FASTEN FRAME FOR INSIDE OR OUTSIDE MOUNT WITH MOUNTING STRIP Drill installation holes 3 8 diameter holes must be drilled at each hinge Using Product labels for guidance place the side frame in open...

Страница 5: ...Back PANEL LOCK INSTALLATION Once the shutter and panels have been installed Use a pencil to mark the windowsill to show where the center of the panel lock plunger is located as well as the front of t...

Страница 6: ...e the T Post has been successfully secured return to Step 8 to complete Shutter installation process T POST INSTALLATION T POST ALIGNMENT BLOCK WITH 4 SIDED FRAME A Installing Alignment Blocks See Fig...

Страница 7: ...installed shutter Allow the level to hang across the face of the second door Begin installing the second frame and make sure the top frame aligns with the level and thus the first shutter Finish inst...

Страница 8: ...nstall the bottom installation screw until there is no load Continue with all other installation screws one at a time while checking for load 2 If there is a load on a Bi fold panel deal with the firs...

Страница 9: ...utter material will not discolor and is warranted not to with normal use and proper cleaning and maintenance Any situation of discoloration is a direct result of residue from a cleaner or natural buil...

Страница 10: ...Customer Service at 1 800 LEVOLOR or 1 800 538 6567 NOTE Improper cleaning may void warranty CONTACTING US To contact LEVOLOR Customer Service regarding any questions or concerns you may have about yo...

Страница 11: ...Barra de inclinaci n Sistema de cierre de engranajes Motorizaci n Los postigos INSTALACI N FUNCIONAMIENTO CUIDADO...

Страница 12: ...onalmente compruebe los siguientes art culos y tome nota de estas selecciones ya que afectar a los pasos siguientes Registre el montaje el estilo del marco y el n mero de postes en T si corresponde ya...

Страница 13: ...n T Paso A y B en la p gina 10 Inserte cu as de esquina Todos los estilos de marco excepto las aplicaciones de marco en L de montaje exterior Inserte las cu as de esquina en los marcos superior e infe...

Страница 14: ...Coloque los paneles en el marco Inserte los pasadores de las bisagras en las bisagras PASO 7 ENCUADRE Y NIVELE LOS PANELES SEG N LA APERTURA consulte el diagrama a la derecha Confirme que los paneles...

Страница 15: ...e calafateo o sellador para sellar cualquier espacio alrededor de los marcos o esquinas a inglete INSTALACI N DEL BLOQUEO DE PANEL Una vez instalados las persianas y los paneles Use un l piz para marc...

Страница 16: ...e l piz colocando un tornillo de instalaci n 8 x 2 horizontalmente a trav s del orificio pretaladrado en el costado del poste en T en la parte inferior El tornillo pasar entre los 2 bloques de alineac...

Страница 17: ...ERTA ESTILO FRANC S CON RECORTE ENSAMBLAJE DEL MARCO PARA MARCOS DE 4 LADOS PASO 1 ENSAMBLE EL MARCO Para evitar da os durante el env o el panel y el marco se enviar n como una unidad completamente en...

Страница 18: ...uesto del marco contra la pared Una vez que el marco se haya asegurado a la pared contin e insertando tornillos en los puertos de tornillos restantes verificando el nivel una vez que se haya apretado...

Страница 19: ...n sobre el montante lo que obliga a la puerta a abrirse con un efecto de resorte Si la carga es excesiva existe la posibilidad de que los listones sean dif ciles de cerrar El ajuste de la carga puede...

Страница 20: ...emo de la manguera Para evitar perder polvo incline los listones para que tambi n pueda limpiar la parte posterior LIMPIEZA DE MANCHAS EN CASA Con un pa o suave lave con jab n suave y agua Para la suc...

Страница 21: ...2021 LEVOLOR Inc 5775 Glenridge Drive Building A Atlanta GA 30328 1022521 20 0042 007...

Отзывы: