Once your name is displayed,
press the center button .The
RZCPG will confirm inclusion
and prompt you to continue to
INCLUDE CONTROLLER
by
pressing the center button or
to continue to the
NEXT STEP
by pressing the right soft key
NOTE:
The confirmation process will take some
time, specifically in large networks. Remain close to
the controller until the confirmation is complete.
Update Controller
NOTE:
The
INSTALL
CHECKLIST
screen will appear
with the selection box around
STEP 3 - Update Controller
when
NEXT STEP
is chosen
from
STEP 2
.
Press the center button
to
bring up the
UPDATE CNTRLS
screen where a list of all the
controllers in the network will be
displayed. With the selection box
around the first controller listed
press the center button . The
RZCPG will prompt you to stand
within 3 feet of that controller.
Press the right soft key
(YES)
to update your controller.
NOTE:
It is important that you remain
within 3 ft. of the controller
you've selected from the list.
If you are unsure about which
controller you are updating
you can use the "who Is"
command (see pg. 13).
Leviton controllers will blink
during the update process,
confirming you are updating
the correct controller.
Once the RZCPG confirms
UPDATE
it will display the updated node
information. Press the center button to finalize.
x1
Back
Next Step
Node included!
Node ID #3:
Room Controller
INCLUDE CNTRLLER
More? Press
STEP 3
x1
Back
(2)
Who Is
UPDATE CNTRLS
Room Controller
Hall Controller
x1
NO
YES
UPDATE
Please stand within
3 ft from controller
and press YES
to continue
x1
Return
UPDATE
Node Updated!
Node ID #4
Room controller
8
x1
Back
INSTALL CHECKLIST
1. Include Dim/Swch
2. Include Controller
3. Update Controller
4. Create Areas
5. Set Associations
Next Step