Table of Contents
Unpack Rack(s)…………………………………….………….…… 1
Assemble Racks………………………………….………..….…… 1
Set Rack(s).…………………………………………………………. 1
Terminate Conduits………………………………………………… 3
Pull Power, Load and Control Conductors to the Racks………. 3
Connect Power Feeders ………………………………..……...… 4
Label Circuits.………………………………………………………. 5
Connect Load Conductors……………………………………..…. 5
Low-Voltage Application Notes….………………………..………. 5
Connect Control Conductors……………………………………… 6
Seal Unused Openings……………………………………………. 7
Set Non-Dim Switches.…………………………………..……….. 8
Install Control Module(s).………………………………………….. 8
Set Thumbwheel Switch(es)………………………………..…….. 9
Set Panic Switches………………………………………..………. 10
Apply Power and Check…………………………………..….…… 10
Install Dimmers……………………………………………...……… 11
Install Filler Modules……………………….…...…………..……… 11
Test Loads…………………………………………………..……… 11
Close Door………………………………………………………….. 12
Maintenance………………………………………………………… 13
Specifications (Table IV)…………………………………………... 13
Warranty…………………………………………………………….. 14