EN
14
Connect the connection cable (machine interface) to the safety sensor and
connect it to the machine control components as described in the original
operating instructions.
Pin assignment
Step 5: Align and start up MLD530 muting transceiver
Switch on the safety sensor.
Adjust the height of the safety sensor and the Deflecting Mirror. After the
Allen screws are loosened
1
, the devices can be slid easily into the slot.
Adjust the axial alignment of the safety sensor and the Deflecting Mirror.
After the Allen screws
2
have been loosened, the entire column with the
built-in device can be rotated slightly.
Step 6: Align and start up muting sensor sets
A: Position the sensors/reflectors.
Loosen the duct cover
1
and the Allen screw
2
.
Position the sensors/reflectors by moving in the axial direction
3
.
After aligning, retighten the Allen screw
2
.
Cut the duct cover to the appropriate length and remount
1
.
B: Align the sensors and reflectors.
Loosen the two Phillips screws
4
.
Turn to set the correct angle of the sensors/reflectors
5
.
After aligning, retighten the Phillips screws
4
.
The optimal alignment has been achieved when the green LEDs on the
muting sensors illuminate!
Step 7: Edit
Checklist – prior to the initial start-up
Start up the machine or system according to the original operating
instructions of the safety sensor.
Service hotline
You can find the contact information for the hotline in your country on our website
www.leuze.com under Contact & Support.
Pin
Connection to MLD MS1
MS2
LMP
RES
1
24 V
24 V
24 V
24 V
24 V
2
MS2
RES/LMP RES/LMP
3
0 V
0 V
0 V
0 V
0 V
4
MS1
MS1
MS2
RES/LMP RES/LMP
5
RES/LMP
Содержание MLDSET-M1
Страница 3: ...3 Step 1 2 ...
Страница 4: ...4 Step 2 4 2 5 3 1 ...
Страница 5: ...5 Step 3 06 06 06 06 ...
Страница 6: ...6 Step 4 4 3 2 1 MS1 MS2 LMP RES MS1 MS2 LMP RES ...
Страница 7: ...7 Step 5 1 2 2 2 1 ...
Страница 8: ...8 Step 6 ...