Commissioning and configuration
Leuze electronic
MA 248
i
65
TNT
35/7-2
4
V
12.2
Starting the device
Apply the supply v18 … 30VDC (+24VDC model); the MA 248
i
starts up.
12.3
Configuration steps for a Siemens Simatic S7 control
The following steps are necessary for commissioning with a Siemens S7 control:
1.
Preparation of the control system (S7 PLC)
2.
Installation of the GSDML file
3.
Hardware configuration of the S7 PLC
4.
Configuration of the modules
5.
Transmission of the PROFINET configuration to the controller (S7 PLC)
6.
Naming the device
•
Configuration of the device name
•
Naming the device
•
Assignment of the device names to the configured IO devices (Figure 10.3...)
•
Assignment of MAC address - IP address - individual device name (Figure 10.4)
7.
Check device name