Commissioning
Switch−on sequence
66
EDK10200EV3 DE/EN/FR 7.1
Switch−on sequence
1.
Before switching on the supply voltage
check the wiring for completeness and short
circuit.
2.
Switch on the supply voltage for the Drive PLC and the PC.
3. Start the Drive PLC Developer Studio" (DDS) software.
4.
Set the communication parameters. (
Drive PLC Developer Studio − Getting
started")
5.
Load the required project into the Drive PLC. (
Drive PLC Developer Studio −
Getting started")
6.
Start the program. (
Drive PLC Developer Studio − Getting started")
Program control
You have various options to control the program in the Drive PLC:
Control with
Program function
Setting/parameter setting
Software Drive PLC Developer
Studio (DDS)
start, stop, reset
DDS Manual − Getting started"
l
Software Global Drive
Control" (GDC)
l
Keypad XT 9371BC
Automatic start
C2104 = −0−
*)
Program does
not
start
automatically after power−on
C2104 = −1−
Program starts automatically
after power−on
start, stop, reset
C2108 = −0−
*)
Function executed
C2108 = −1−
Start program
C2108 = −2−
Stop program
C2108 = −3−
Reset program
*)
Lenze setting
Содержание EPL1020 Series
Страница 3: ...0 1 2 5 4 3 9 6 7 8 EPL1020x El plc021...
Страница 107: ......
Страница 108: ......
Страница 109: ......