Figure 164. Hot-swap power supply removal
After removing the power supply:
1. Install a new power supply or install the power-supply filler to cover the power supply bay. See “Install a
hot-swap power supply” on page 179.
Important:
To ensure proper cooling during normal server operation, both of the power supply bays
must be occupied. This means that each bay must have a power supply installed; or one has a power
supply installed and the other has a power supply filler installed.
2. If you are instructed to return the old hot-swap power supply, follow all packaging instructions and use
any packaging materials that are provided.
Install a hot-swap power supply
Use this information to install a hot-swap power supply.
Ground package before opening”
The following tips describe the type of power supply that the server supports and other information that you
must consider when you install a power supply:
• The standard shipping has only one power supply installed in the server. For redundancy and hot-swap
support, you must install an additional hot-swap power supply. Certain customized models might be
shipped with two power supplies installed.
• Ensure that the devices that you are installing are supported. For a list of supported optional devices for
the server, see
https://static.lenovo.com/us/en/serverproven/index.shtml
Notes:
• Ensure that the two power supplies installed on the server have the same wattsage.
.
Hardware replacement procedures
179
Содержание ThinkSystem SR635
Страница 1: ...ThinkSystem SR635 Maintenance Manual Machine Types 7Y98 and 7Y99 ...
Страница 5: ...Index 231 Copyright Lenovo 2019 2021 iii ...
Страница 6: ...iv ThinkSystem SR635 Maintenance Manual ...
Страница 10: ...viii ThinkSystem SR635 Maintenance Manual ...
Страница 12: ...Figure 2 QR code 2 ThinkSystem SR635 Maintenance Manual ...
Страница 22: ...12 ThinkSystem SR635 Maintenance Manual ...
Страница 88: ...78 ThinkSystem SR635 Maintenance Manual ...
Страница 133: ...Figure 102 Riser 1 assembly LP FHFL removal Chapter 3 Hardware replacement procedures 123 ...
Страница 136: ...Figure 105 Riser 1 assembly LP FHFL installation 126 ThinkSystem SR635 Maintenance Manual ...
Страница 214: ...204 ThinkSystem SR635 Maintenance Manual ...
Страница 232: ...222 ThinkSystem SR635 Maintenance Manual ...
Страница 240: ...230 ThinkSystem SR635 Maintenance Manual ...
Страница 245: ......
Страница 246: ......