Step 6. Secure the rear mounting bracket of the rail with two M5 screws.
Step 7. Extend the rail until the front mounting bracket of the rail reaches the front rack.
Step 8. Repeat steps Step 1
on page 27 to install the front rail mounting
bracket to the front mounting flange.
Attention:
• For the front mounting bracket, the screws for square hole rack need to be fastened in the same
holes as the preinstalled screws for round hole rack. Otherwise, the storage enclosure cannot be
secured to the front mounting bracket.
• After fastening the two screws for square hole rack, do not further secure the front mounting
bracket of the rail with screws until you install the storage enclosure into the rack.
Step 9. Repeat steps Step 1
on page 28 to install the opposite rail in the
rack.
The installation of the storage block slide rails in a square hole rack is now complete.
The next step is to install the storage enclosure: “Install the storage enclosure” on page 29
28
Lenovo ThinkAgile CP Hardware Installation Guide
Содержание ThinkAgile CP 4000 Series
Страница 1: ...Lenovo ThinkAgile CP Hardware Installation Guide Models CP4000 CP6000 ...
Страница 4: ...ii Lenovo ThinkAgile CP Hardware Installation Guide ...
Страница 6: ...iv Lenovo ThinkAgile CP Hardware Installation Guide ...
Страница 8: ...vi Lenovo ThinkAgile CP Hardware Installation Guide ...
Страница 26: ...18 Lenovo ThinkAgile CP Hardware Installation Guide ...
Страница 70: ...Figure 42 X Link option 1 topology 62 Lenovo ThinkAgile CP Hardware Installation Guide ...
Страница 73: ...Figure 44 X Link topology option 2A Chapter 3 ThinkAgile CP Setup 65 ...
Страница 78: ...70 Lenovo ThinkAgile CP Hardware Installation Guide ...
Страница 80: ...72 Lenovo ThinkAgile CP Hardware Installation Guide ...
Страница 82: ...74 Lenovo ThinkAgile CP Hardware Installation Guide ...
Страница 83: ......
Страница 84: ......