Page 8
TABLE 1
NON-COMBUSTIBLE FLOOR OPENINGSIZE
Cabinet Width
Front to Rear
Side to Side
in
mm
in
mm
B Cabinet 17 - 1/2” 19 - 3/4
502
16 - 5/8
422
C Cabinet 21”
19 - 3/4
502
20 - 1/8
511
NOTE - Floor opening dimensions listed are 1/4 inch (6 mm) larger than
the unit opening. See dimension drawing on page 2.
SUPPLY AIR
PLENUM
PROPERLY
SIZED FLOOR
OPENING
FURNACE
FIGURE 8
Installation on Combustible Flooring (FIGURE 9)
1 -
When unit is installed on a combustible floor,
a downflow combustible flooring base must be
installed between the furnace and the floor. The
base must be ordered separately. See TABLE 2 for
opening size to cut in floor.
CAUTION
The furnace and combustible flooring base shall not be
installed directly on carpeting, tile, or other combustible
material other than wood flooring.
TABLE 2
COMBUSTIBLE FLOORING BASE OPENING SIZE
Cabinet
Width
Catalog
Number
Front to Rear
Side to Side
in
mm
in
mm
B Cabinet
17 - 1/2”
11M60
22
559
18 - 3/4
476
C Cabinet
21”
11M61
22
559
22 - 3/4
578
FURNACE
SUPPLY AIR
PLENUM
COMBUSTIBLE
FLOORING BASE
PROPERLY
SIZED FLOOR
OPENING
FIGURE 9
2 -
After opening is cut, set combustible flooring base
into opening.
3 -
Check fiberglass strips on combustible flooring
base to make sure they are properly glued and
positioned.
4 -
Lower supply air plenum into combustible flooring
base until plenum flanges seal against fiberglass
strips.
NOTE -
Be careful not to damage fiberglass strips.
Check for a tight seal.
5 - Set the furnace over the plenum.
6 - Ensure that the seal between the furnace and
plenum is adequate.
Installation on Cooling Coil Cabinet (FIGURE 10)
NOTE -
Downflow combustible flooring base is not used.
1 -
Refer to reverse-flow coil installation instructions for
correctly sized opening in floor and installation of
cabinet.
2 - When cooling cabinet is in place, set and secure
the furnace according to the instructions that are
provided with the cooling coil. Secure the furnace
to the cabinet.
3 - Seal the cabinet and check for air leaks.
COOLING COIL
PLENUM
PROPERLY
SIZED FLOOR
OPENING
FURNACE
FIGURE 10
Содержание SIGNATURE SLP99DF070V36
Страница 40: ...Page 40 FIGURE 49...