9
Electrical work
C: Putting nut on
Remove flare nuts attached to indoor and
outdoor unit, then put them on pipe/tube having
completed burr removal. (Not possible to put
them on after flaring work).
D: Flaring work
Firmly hold copper pipe in a die in the
dimension shown in the table below.
A (mm)
Outer diam.
(mm)
Max. Min.
Φ
6.35
1.3 0.7
Φ
9.53
1.6 1.0
Φ
12.7
1.8 1.0
Tightening Connection
•
Align the center of the pipes.
•
Sufficiently tighten the flare nut
with fingers, and then tighten it
with a spanner and torque wrench
as shown.
CAUTION
•
Excessive torque can break nut
depending on installation conditions.
Outer diam.
Tightening
torque (N.cm)
Additional tightening
torque (N.cm)
Φ
6.35
1570
(160 kgf.cm)
1960
(200 kgf.cm)
Φ
9.53
2940
(300 kgf.cm)
3430
(350 kgf.cm)
Φ
12.7
4900
(500 kgf.cm)
5390
(550 kgf.cm)
ELECTRICAL WORK
Electric safety regulations for the initial Installation
1. If there is serious safety problem about the power supply, the technicians should refuse to
install the air conditioner and explain to the client until the problem is solved.
2. Power voltage should be in the range of 90%~110% of rated voltage.
3. The creepage protector and main power switch with a 1.5 times capacity of Max. Current of
the unit should be installed in power circuit.
4. Ensure the air conditioner is grounded well.
5. According to the attached Electrical Connection Diagram located on the panel of the outdoor
unit to connect the wire.
6. All wiring must comply with local and national electrical codes and be installed by qualified
and skilled electricians.
7. An individual branch circuit and single receptacle used only for this air conditioner must be
available. See the following table for suggested wire sizes and fuse specifications:
Содержание Relax series
Страница 2: ......
Страница 3: ...ENGLISH...
Страница 17: ...ESPA OL...
Страница 31: ...FRAN AIS...
Страница 45: ...DEUTSCH...
Страница 59: ...NEDERLANDS...
Страница 73: ...PORTUGU S...
Страница 87: ......