background image

NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.

17

Figure 45

Stabilizer

A

1

20'

Max.

B

1

10' Max.

Offset

Elbow

Return

Elbow

A

1

C

1

B

1

B

2

C

2

A

2

A

1

C

1

B

1

B

2

C

2

A

2

Chimney

Section

Joints

No. 8 x 1/2" SMS

t

d

eri

u

q

e

s

w

er

c

S

'6 

ts

a

P t

ni

o

yr

e

v

E

nI 

d

eri

u

q

e

s

w

er

c

o

N

te

sff

fo 

'6 

ts

ri

F r

o

st

ni

o

J

4'

6'

Underside Of Chimney

Chimney Section (S)

FTF8-E30 Return Elbow*

FTF8-30 Offset Elbow*

B

A

*Part of Offset/Return Package Model FTF8-ES30

Figure 46

Figure 47

Figure 48

Figure 49

Step 1.

 Determine the offset distance where 

chimney is to pass through the fi rst 
ceiling-dimension “A.” To fi nd this 
point on your ceiling, fi rst determine 
the center point for a vertical chimney 
following the instructions for vertical 
installation.

 

 

 Measure height to the ceiling from the 

top of fi replace-dimension “B.” Use the 
appropriate Offset Elevation Chart to fi nd 
dimension “A.” Mark point where you 
will drive your nail to show the center 
point for your offset ceiling cut.

Step 2.

 Proceed by using the Straight Up In-

stallation Instructions for cutting and 
framing ceiling and roof openings.

Note:

 See Framing and Dimension Chart for 

the sizes of the ceiling and roof openings. The 
size of the roof opening varies with the degree 
of pitch of the roof.

Offset Elbow Assembly

Offset elbows install the same as chimney 
sections. First, snap the inner section INTO the 
preceding inner section of fl ue. Check connec-
tion by pulling up slightly to ensure a tight fi t. 
Next, the outer sections snap lock OVER the 
preceding outer section of chimney. Again, 
check outer section by pulling up slightly to 
ensure proper connection is made.

Return Elbow Assembly

Return elbows install the same way as round 
terminations and stabilizers:

Step 1.

 Hold return elbow over top of last 

chimney section.

Step 2.

 Center inner slip section into inner fl ue 

pipe-slip down.

Step 3.

  Center outer-locking section over outer 

chimney pipe. Push down until locking 
joint has fi rmly engaged.

Step 4.

  Pull up slightly on return elbow to ensure 

locking joint has fi rmly engaged.

Step 5.

  Secure support straps to framing 

members by nailing under tension in 
sheer (

Figure 50

).

INSTALLING OFFSETS

First, review the Offset Elevation Chart and 

Figure 49

  for reference.

Содержание Merit Plus MP-420D

Страница 1: ...EQUIPPED TO BE READILY IN STALLED OUTDOORS IF INSTALLED INDOORS YOU MUST INSTALL THE COMBUSTION AIR COVER PROVIDED WITH THE INSTALLATION KIT OR PURCHASE THE OPTIONAL OUTSIDE AIR KIT GATE OAKG OD SEE...

Страница 2: ...tate and national codes and regulations 3 ThisfireplacemustbeinstalledwithSecurity Chimneys FTF8 8 203mm inside diam eter Chimney System only This fireplace is intendedforindoororoutdoorinstallations...

Страница 3: ...always maintain minimum clearances to combustible materials and do not violate any specific installation requirements These fireplaces have been tested and listed by OMNI Test Laboratories Inc Report...

Страница 4: ...materials Outdoor installations less than 15 height require chimney clearance of 2 air space to insulation and construction materials In Canada the chimney and fireplace outer wrapper require a minimu...

Страница 5: ...kept within the shaded areas illustrated in Figure 7 CLEARANCES Minimum clearance to combustibles for the appliance is as follows sides and back 1 25 mm floor 0 0mm adjacentwall 12 305 mm ceiling 37 1...

Страница 6: ...t If you plan to raise the fireplace and hearth extension build the platform assembly then position fireplace and hearth extension on top Secure the platform to the floor to prevent possible shifting...

Страница 7: ...the outside air kit is NOT installed you must install the Outside Air Cover provided with the instructions kit b IfanoutsideairkitISinstalled theOutside Air Kit Gate must be installed see Page 23 of o...

Страница 8: ...ons Outside Air Kit Installation provided These appliances are equipped with a com bustion air inlet collar so that it is possible to duct combustion air from the outdoors to the firebox To accomplish...

Страница 9: ...g Materials if any Rough Framing Face Unfinished Shown Combustion Air Kit Optional Framing Dimensions A 46 1 2 1181 mm B1 43 1 2 1105 mm B2 60 1 2 1537 mm C 33 828 mm D 17 1 2 445 mm E 76 1 4 1937 mm...

Страница 10: ...ions must not interfere with circulating grillwork Figure 19 Figure 20 A B Ceiling Framing C D Roof Framing Framing Dimensions for Ceiling Inches millimeters Flue Type A B FTF8 Vertical USA 14 1 2 368...

Страница 11: ...les espaceurs du dessus du foyer voir le sch ma 13 ne peuvent tre retir es ou modifi es vous ne pouvez pas entaillez le colombage pour ajuster autour ou tre install plus bas que les espaceurs Le colom...

Страница 12: ...and outer wrapper require a minimum 2 air space to insulation and construction materials Reference Figures 19 20 and charts Framing DimensionsforCeilingandRoof whichspecify minimum ceiling and roof di...

Страница 13: ...e the building must be con structed with galvalume outer sections only Theappropriatemodeldesignationsarelocated in the back of this manual F8FS30 Firestop Spacer FTF8 S4 Stabilizer 1 Min Air Space 30...

Страница 14: ...as noted in Step 4 Step 6 Select the proper Security Chimneys roof flashing based on pitch of roof Use chart below for selection Figure 37 Note Do not caulk or seal the ventilating open ings or seal t...

Страница 15: ...chimney must be at least 2 above this reference point In all cases thechimneycannotbelessthen3 above the roof at the edge of the chimney The 2 in 10 rule is necessary in the interest of safety but doe...

Страница 16: ...36 48 11 0 11 1 0 0 0 17 1 5 0 1 0 0 21 1 9 2 0 0 0 27 2 3 1 1 0 0 35 2 11 0 0 1 0 47 3 11 0 0 0 1 51 4 3 0 1 1 0 57 4 9 1 0 0 1 63 5 3 0 1 0 1 67 5 7 2 0 0 1 73 6 1 1 1 0 1 81 6 9 0 0 1 1 93 7 9 0 0...

Страница 17: ...the Straight Up In stallation Instructions for cutting and framing ceiling and roof openings Note See Framing and Dimension Chart for the sizes of the ceiling and roof openings The size of the roof op...

Страница 18: ...ilizer Considerthiswhen determining the need for a stabilizer Note Do not apply excessive pressure to any subsequent chimney section following return elbow assembly when installing Ensure that each su...

Страница 19: ...c tions are placed lower than 18 inches from the fireplace opening These fireplaces have been marked with a maximum rating of 26 000 BTU to assure that homeowners do not exceed the allowable limits fo...

Страница 20: ...ux non combustibles il se pourrait qu il n y ait pas suffisament de d gagement pour installer les portes de verre de votre choix Assurez d avoir un d gagmet suf fisant tout moment afin de ne pasinterf...

Страница 21: ...es 416 x 1 Answer TheminimumrequiredthicknessoftheMicore160is 417 there fore round up to nearest standard thickness available which is 1 2 Using the r formula Note To convert inches to millimeters div...

Страница 22: ...ormal wall decor with elaborate mantels to rustic wood paneling or warm brick facings Only noncombustible materials like stone tile brick etc may overlap the black front facing Do not extend these mat...

Страница 23: ...ith fireplace Shownhereforre placement purposes only Locking Band 63L60 FLB Ref Form 750 080M Spark Arrester 63L57 FSA 2 Ref Form 750 198M INSTALLATION COMPONENTS The following items are available for...

Страница 24: ...n For open top shrouds 96L20 FTF8 CTT Ref Form 750 077M Chimney Pack conventional Convenience Pack Residential 63L70 FTF8 CP7 Contains 3 FTF8 36 1 F8FS 1 F8F6 1 FTF8 CTD 7 P C 8 F T F R O I R E P U S...

Отзывы: