4-- Ram Control (A3)

Early Model G24M Units

The furnace control combines burner ignition func-
tions with blower control functions.
Early model G24M units utilize a furnace control
manufactured by RAM Electronics Corporation. The
“RAM” board is a printed circuit board which controls
the blower, gas valve, combustion air blower and igni-
tion spark. It also monitors the flame, limit and gas valve
operation. The control has a non--adjustable, factory
preset “on” fan timing (45 seconds). Fan “off” timings
are adjustable. The board utilizes both 120 and 24VAC.
See figure 9. The board is also equipped with a diagnos-
tic LED for use when troubleshooting the unit.
When the furnace is idle (blower off and no heating or
cooling demand), the diagnostic LED flashes at a slow
steady rate. On a call for heat, the diagnostic LED be-
gins flashing at a fast rate and the combustion air
blower is energized. The LED flashes different codes to
indicate problem conditions. The diagnostic LED lights
red (not flashing) to indicate control board failure. Table
7 shows how to interpret the other LED modes.
Pre-Purge

On a call for heat, the combustion air blower begins
operating. If the combustion air prove switch closes,
the combustion air blower continues to operate for 45
seconds (pre-purge) before allowing ignition. Pre-
purge allows the heat exchanger to be cleared of com-
bustion products and to introduce fresh air for com-
bustion. If the combustion air prove switch does not
close, the combustion air blower continues to run in-
definitely (until the prove switch closes).
Post-Purge

After a demand, the combustion air blower continues
to operate for 5 seconds (post-purge) before stopping.
Post-purge allows the heat exchanger to be cleared of
combustion products.

Ignition Control
The ignition control is a direct spark ignition control
module integral to the furnace control. See figure 9.
When there is a call for heat, the control delays ignition
until combustion air blower operation has been proved
and pre-purge period has elapsed. It then opens the gas
valve and generates a spark to ignite the burners. Trial
for ignition lasts for 7 seconds. At the same time, the
control begins monitoring the flame sensor. If the flame
current is too weak (less than 1 microamp) or if the
burners do not ignite (within the 7 second ignition trial),
the control will shut off the spark ignitor and the com-
bustion air blower and de-energize the gas valve.
Flame current should be between 1 and 5 microamps to
keep the gas valve open. See figure 21.
The control will attempt to ignite the burners up to two
more times. Each time the control restarts the ignition
sequence, it begins with a 45 second pre-purge. If flame
is not sensed after the third trial, the control locks out.
Lockout means that the control shuts off the gas valve,
spark and combustion air blower for 60 minutes. At the
end of 60 minutes the control completely resets and
will attempt ignition up to three times. The control can
be manually reset before the end of 60 minutes by mo-
mentarily turning off power to the unit.

DANGER

Shock hazard.

Spark related components contain high voltage.

Disconnect power before servicing. Control is not

field repairable. If control is inoperable, simply re-

place entire control.

Can cause injury or death. Unsafe operation will

result if repair is attempted.

Содержание G24M SERIES

Страница 1: ...of local or state codes the guidelines and procedures outlined in this manual except where noted are recommended only and do not constitute code SPECIFICATIONS Model No G24M2 X 45 G24M2 60 G24M3 X 60...

Страница 2: ...characteristics 120 volts 60 hertz 1 phase less than 12 amps All models H Optional Accessories Must Be Ordered Extra H LPG propane kit LB 69845L 38K84 LB 69845K 81J14 Twinning Kit 96J69 5 lbs 2 kg Up...

Страница 3: ...6 x 20 x 1 Filter Rack No Size of Filters mm 2 406 x 508 x 25 Down flow Combustible Floor Base LB 79239B 67J92 10 lbs 4 kg LB 79239C 67J93 12 lbs 5 kg Sidewall Power Venting Kit 79J15 25 lbs 11 kg Han...

Страница 4: ...e Also see Filter Air Resistance table G24M4 75 G24M3 4 100 AND G24M3 4 120 BLOWER PERFORMANCE External Static Air Volume at Various Blower Speeds External Static Pressure High Medium High Medium Medi...

Страница 5: ...0 1125 2105 995 1930 910 1675 790 1480 700 30 75 2360 1115 2090 985 1915 905 1670 790 1470 695 40 100 2310 1090 2050 965 1870 880 1650 780 1440 680 50 125 2260 1065 2000 945 1810 855 1610 760 1410 665...

Страница 6: ...RY LIMITS FRONT LOUVERED PANEL DOOR INTERLOCK SWITCH CONTROL BOARD TRANSFORMER PRESSURE SWITCH NOx TURBULATOR LOW PRESSURE SWITCH Propane Only PRIMARY LIMIT FIGURE 2 HEATING COMPONENTS shown in horizo...

Страница 7: ...PRIMARY LIMIT ROLLOUT SWITCHES SURELIGHT IGNITOR FIGURE 4 To Access Blower 1 Turn off power to unit and disconnect L1 and L2 line voltage power 2 Disconnect thermostat wiring connec tions from furnac...

Страница 8: ...Shock hazard Disconnect power before servicing Control is not field repairable If control is inoperable simply replace entire control Can cause injury or death Unsafe operation will result if repair...

Страница 9: ...ration signaled when heating demand initiated at thermostat SLOW FLASH ON Primary or Secondary limit open Units with board 63K8901 or 24L85 Limit must close within 5 trials for ignition or board goes...

Страница 10: ...20 seconds after which the gas valve opens for a 4 second trial for ignition The ignitor stays en ergized for the first second of the 4 second trial G24M units with 63K89 24L85 or 56L83 the ignitor s...

Страница 11: ...e After a demand the combustion air blower continues to operate for 5 seconds post purge before stopping Post purge allows the heat exchanger to be cleared of combustion products Ignition Control The...

Страница 12: ...he indoor blower starts after a 45 second delay Gas valve remains open and blower continues to run until demand stops flame sensor senses loss of flame a limit opens or the prove switch opens If any o...

Страница 13: ...C Out T o Rollout Switches RO IN J20 P20 Pin 15 24VAC In From Rollout Switches SPARK ELECTRODE Male Spark Plug Type High Voltage Out T o Spark Electrode FS J20 P20 Pin 12 Flame Microamp Sensing FIGURE...

Страница 14: ...ly reset a tripped switch push the reset button located on the control FIGURE 12 ROLLOUT SWITCH S47 MANUAL RESET BUTTON E Primary Limit Control S10 FIGURE 13 G24M SERIES UNITS LIMIT CONTROL FOR THIS T...

Страница 15: ...ition control 24V applied to the terminals energizes the valve Inlet and outlet pressure taps are located on the valve A regulator adjustment screw is located on the valve Refer to figure 17 or 18 for...

Страница 16: ...y and Seasonal Checks 1 Inspect electrical wiring both field and factory installed for loose connections Tighten as required 2 Check voltage at disconnect switch Voltage must be within range listed on...

Страница 17: ...ent dam age to gas valve or overfire For natural gas units op erating pressure at unit gas connection must be be tween 5 0 W C and 13 0 W C For L P gas units operating pressure at unit gas connection...

Страница 18: ...itudes Refer to table 12 for pressure switch replacement for models at elevations of 4500 feet 1372m and greater TABLE 11 ALTITUDE feet m GAS FUEL MANIFOLD PRESSURE in W C kPa 0 4500 Natural 3 5 0 87...

Страница 19: ...unit rating plate To Measure Temperature Rise 1 Place plenum thermometers in the supply and return air plenums Locate supply air thermometer in the first horizontal run of the plenum where it will no...

Страница 20: ...SE CURELY IN PLACE E Blower Speed Taps Leaded Motors Blower speed tap changes are made on the SureLight control board See figure 6 Unused taps must be secured on dummy terminals PARK M1 and or PARK M...

Страница 21: ...tial for gas leaks fire or explosion Some soaps used for leak detection are corrosive to certain metals Carefully clean piping thor oughly after leak detection has been completed Can cause damage to p...

Страница 22: ...92 7 7 3 0 5 1 5 0 1 851 6 167 5 75 16 250 5 225 17 5 2 6 7 20 867 21 5 2 5 35 6685 6 7 1 7 5 35 0 5 0 7 0 52 287 6 7 6 85 COMPRESSOR COMMON POWER HEAT INDOOR BLOWER COMMON HS UNIT COMMON HS UNIT COMP...

Страница 23: ...lower nears full speed combustion air prove switch S18 closes 5 When S18 closes assuming the flame rollout switch S47 primary limit S10 and secondary limits S21 are closed the furnace control begins a...

Страница 24: ...N RESET THERMOSTAT LED 5 flash if flame sensed with valve off LED Steady on if control board failure NO NO CHECK TO SEE IF MAIN VALVE IS OFF SEQUENCE HOLDS UNTIL HI LIMIT CLOSES LED 4 flashes NO CHECK...

Страница 25: ...e REMAINS UNCHANGED THROUGHOUT SEQUENCE THERMOSTAT CALLS FOR COOLING SYSTEM FAN SWITCHES TO HEATING SPEED AFTER SELECTED DELAY ACC TERM REMAINS ENERGIZED SYSTEM FAN SWITCHED TO COOLING SPEED ACC TERMI...

Страница 26: ...Pressure Switch delay Once S18 closes a 15 second pre purge follows 4 SureLight control energizes ignitor A 20 second warm up period begins 5 Gas valve opens for a 4 second trial for ignition Ignitor...

Страница 27: ...G SPEED LED 1 SLOW FLASH LED 2 OFF GAS VALVE OFF COMBUSTION AIR BLOWER OFF INDOOR BLOWER OFF WITH DELAY LED 1 OFF LED 2 SLOW FLASH Sequence holds until pressure switch closes or thermostat resets cont...

Страница 28: ...TO SENSE FLAME FOR FIVE CONSECUTIVE TRIES DURING A SINGLE HEAT DEMAND IGNITION WATCHGUARD MODE GAS VALVE OFF COMBUSTION AIR INDUCER OFF INDOOR BLOWER OFF WITH DELAY LED 1 ALT SLOW FLASH LED 2 ALT SLO...

Страница 29: ...CHANGED THROUGHOUT COOLING CYCLE THERMOSTAT CALLS FOR COOLING COMPRESSOR CONTACTOR AND SYSTEM FAN ENERGIZED WITH 0 SECOND DELAY ACB COOL SPEED AND ACC TERM ENERGIZED COMPRESSOR OFF THERMOSTAT OPENS AC...

Страница 30: ...Y THERMOSTAT OPENS COMBUSTION AIR AND HTG ACC TERMINAL DE ENERGIZE SYSTEM FAN SWITCHED TO ACB COOL SPEED ACC TERM REMAINS ON THERMOSTAT OPENS BOARD 63K89 SYSTEM FAN OFF ACC TERM OFF AFTER OFF DELAY CO...

Страница 31: ...ch open ACTION 1 Manually reset the roll out switch by pushing the top button ACTION 2 Determine the cause of the roll out switch activation before leaving furnace out code LED 1 O 1 2 2 Roll out swit...

Страница 32: ...ternating Fast Flash 2 1 2 Broken or failed ignitor ACTION 1 Unplug ignitor and read resis tance across ignitor If resistance does not read between 10 9 and 19 7 ohms replace the ignitor PROBLEM 3 UNI...

Страница 33: ...with a heating demand Diagnostic lights flash the pres sure switch failure code 2 5 min utes after heating demand 4 1 2 Pressure switch does not close due to obstructions in the pressure lines ACTION...

Страница 34: ...atisfying T stat demand Diagnostic lights flash the pres sure switch code LED 1 Off LED 2 Slow Flash 6 1 1 Low pressure differential at the pressure switch ACTION 1 Check for restricted vent inlet or...

Страница 35: ...rsootingdepositsoroth er restrictions in the heat exchanger assem bly Cleanassemblyasoutlinedininstruction manual ACTION 2 ForG24Mgasfurnaces checkfor proper combustion and flow CO2 should measurebetw...

Страница 36: ...ated ACTION 1 Check sense rod for contamina tion or coated surface Clean the sense rod with steel wool or replace sensor DO NOT USE SAND PAPER TO CLEAN ROD SAND PAPER WILL CONTRIBUTE TO THE CON TAMINA...

Отзывы: