Page 24
Start-Up and Performance Checklist
Job Name
Job no.
Date
Job Location
City
State
Installer
City
State
Unit Model No.
Serial No.
Service Technician
Nameplate Voltage
Rated Load Ampacity
Compressor Amperage:
Maximum Fuse or Circuit Breaker
Electrical Connections Tight?
Indoor Filter clean?
Supply Voltage (Unit Off)
Indoor Blower RPM
S.P. Drop Over Indoor (Dry)
Outdoor Coil Entering Air Temp.
Vapor Pressure;
Refrigerant Lines:
Leak Checked?
Properly Insulated?
Outdoor Fan Checked?
Service Valves:
Fully Opened?
Caps Tight?
Voltage With Compressor Operating
SEQUENCE OF OPERATION
Calibrated?
THERMOSTAT
Properly Set?
Level?
Heating Correct
?
Cooling Correct?
Содержание Elite ELS Series
Страница 5: ...Page 5 Unit Plumbing Parts Arrangement ELS072S4S ELS090S4S...
Страница 6: ...Page 6 ELS120S4S ELS120S4D STAGE 2...
Страница 7: ...Page 7 ELS120S4D STAGE 1 ELS150S4D STAGE 2...
Страница 8: ...Page 8 ELS150S4D STAGE 1 ELS180S4D STAGE 2...
Страница 9: ...Page 9 ELS180S4D STAGE 1 ELS240S4D STAGE 2...
Страница 11: ...Page 11 Unit Control Box Components Arrangement...
Страница 16: ...Page 16 FIGURE 7 Typical Wiring Diagram ELS072S4S ELS090S4S and ELS120S4S G J M Y Voltages...