9 - 

 Ensure sufficient combustion air is available to the 

furnace. Fresh air grilles and louvers (on the unit 

and in the room where the furnace is installed) 

must be properly sized, open and unobstructed to 

provide combustion air.

10 -  Inspect the furnace venting system to make sure 

it is in place, structurally sound, and without holes, 

corrosion, or blockage. Vent system must be free 

and clear of obstructions and must slope upward 

away from the furnace . Vent system should be 

installed per the National Fuel Gas Code

11 -  Inspect the furnace return air duct connection to 

ensure the duct is sealed to the furnace. Check for 

air leaks on supply and return ducts and seal where 

necessary.

12 -  Check the condition of the furnace cabinet insulation 

and repair if necessary.

13 -  Perform a complete combustion analysis during the 

furnace inspection to ensure proper combustion 

and operation. Consult Service Literature for proper 

combustion values.

14 -  

Verify operation of CO detectors and replace 

batteries as required.

Perform a general system test. Turn on the furnace to 

check operating functions such as the start-up and shut-

off operation.

1 -   Check the operation of the ignition system, inspect 

and clean flame sensor. Check microamps before 

and after. Check controls and safety devices (gas 

valve,  flame  sensor,  temperature  limits).  Consult 

Service Manual for proper operating range. Thermal 

Limits should be checked by restricting airflow and 

not disconnecting the indoor blower. For additional 

details, please see Service and Application Note 

H049.

2 - 

 Verify that system total static pressure and airflow 

settings 

are within specific operating parameters.

3 -   Clock gas meter to ensure that the unit is operating 

at  the  specified  firing  rate.  Check  the  supply 

pressure and the manifold pressure. On two-stage 

gas furnaces check the manifold pressure on high 

fire and low fire. If manifold pressure adjustment is 

necessary, consult the Service Literature for unit 

specific  information  on  adjusting  gas  pressure. 

Not all gas valves are adjustable. Verify correct 

temperature rise.

Cleaning the Burners

NOTE - 

Use papers or protective covering in front of the 

furnace

during cleaning.

1 -   Turn off both electrical and gas power supplies to 

furnace.

2 -   Label the wires from gas valve, rollout switches, 

primary limit switch and make-up box then 

disconnect them.

3 -   Disconnect gas supply piping. Remove the screw 

securing the burner box cover and remove cover. 

Remove the four screws securing the burner 

manifold assembly to the vestibule panel and 

remove the assembly from the unit.

4 -   To clean burners, run a vacuum cleaner with a soft 

brush attachment over the face of burners. Visually 

inspect inside the burners and crossovers for any 

blockage caused by foreign matter. Remove any 

blockage. Figure 33 shows burner detail.

5 -   Reinstall burner box, manifold assembly and burner 

box cover.

6 -   Re-install gas supply and turn on electrical pwer to 

furnace.

Содержание EL180UHE SERIES

Страница 1: ...t service agency or the gas supplier CAUTION As with any mechanical equipment contact with sharp sheet metal edges can result in personal injury Take care while handling this equipment and wear gloves...

Страница 2: ...49 14 356 9 16 14 3 76 Right 7 178 Left 2 FLUE OUTLET Either Side 3 OPTIONAL EXTERNAL SIDE RETURN AIR FILTER KIT Either Side 16 406 14 3 4 375 3 OPTIONAL EXTERNAL SIDE RETURN AIR FILTER KIT Either Si...

Страница 3: ...h local building codes In the absence of lo cal codes units must be installed according to the current National Fuel Gas Code ANSI Z223 1 The National Fuel Gas Code is available from the follow ing ad...

Страница 4: ...heater during any phase of construc tion Very low return air temperatures harmful vapors and operation of the unit with clogged or misplaced filters will damage the unit EL180UHE units may be used for...

Страница 5: ...rial is not the complete and official position of the ANSI on the referenced subject which is represented only by the standard in its entirety CAUTION Do not install the furnace in a corrosive or cont...

Страница 6: ...the two spac es Each opening must have a minimum free area of 1 square inch 645 mm2 per 1 000 Btu 29 kW per hour of total input rating of all gas fired equipment in the confined space Each opening mu...

Страница 7: ...hour of the total input rating of all equipment in the enclosure If the equipment room is located against an outside wall and the air openings ing shall have a free area of at least one square inch 6...

Страница 8: ...le mounting leg The bolt and washer must be removed before the furnace is placed into operation After the bolt and washer have been re moved the rigid leg will not touch the blower housing RIGID LEG r...

Страница 9: ...turn Air with transition and filter Figure 8 Figure 9 Optional Return Air Base Upflow Applications Only For use with A B C and D cabinets NOTE Optional Side Return Air Filter Kits are not for use with...

Страница 10: ...for clearances to combustible materials as indicated on the unit nameplate Minimum clearances for closet or alcove installations are shown in figure 11 This furnace may be installed in either an attic...

Страница 11: ...filter is being installed as part of this system to ensure better indoor air quality the filter must be properly sized Highefficiency filters have a higher static pressure drop than standardefficiency...

Страница 12: ...4 inch diameter flue transition is factory installed on the combustion air inducer outlet of all models Figure 15 shows the combustion air inducer as shipped from the fac tory Mounting Screws Location...

Страница 13: ...arbed fitting on the pressure switch assembly Remove pressure switch assembly 1 screw and cut wire tie to free pressure switch wires Re install pressure switch on the other side of orifice plate and r...

Страница 14: ...ing document Use self drilling sheet metal screws or a mechanical fas tener to firmly secure the vent pipe to the round collar of the flue transition If self drilling screws are used to attach the ven...

Страница 15: ...fan assisted furnace may be commonly vented into an existing lined masonry chimney if the following conditions are met The chimney is currently serving at least one drafthood equipped appliance The ve...

Страница 16: ...ing to approved engineering methods 5 Multiple appliance vents The flow area of the largest section of vertical vent or chimney shall not exceed 7 times the smallest listed appliance categorized vent...

Страница 17: ...equivalent insulation qualities 14 All venting pipe passing through floors walls and ceilings must be installed with the listed clearance to combustible materials and be fire stopped according to loca...

Страница 18: ...22 339 5 22 65 30 130 39 219 49 330 10 29 59 40 121 51 206 64 315 15 35 53 48 112 61 195 76 301 20 0 0 97 0 202 0 349 0 540 2 10 75 14 149 18 250 20 377 5 21 71 29 143 38 242 47 367 10 28 64 38 133 5...

Страница 19: ...23 47 36 86 51 136 67 206 3 24 50 37 92 52 146 69 220 15 1 21 50 33 89 47 142 64 220 2 22 53 35 96 49 153 66 235 3 24 55 36 102 51 163 68 248 20 1 21 54 33 99 46 157 62 246 2 2 57 34 105 48 167 64 25...

Страница 20: ...ection CAUTION If a flexible gas connector is required or allowed by the authority that has jurisdiction black iron pipe shall be installed at the gas valve and extend outside the furnace cabinet The...

Страница 21: ...985 27 89 873 24 72 791 22 39 728 20 61 677 19 17 635 17 98 600 17 00 2 50 8 2 067 52 502 4020 113 83 2760 78 15 2220 62 86 1900 53 80 1680 47 57 1520 43 04 1400 39 64 1300 36 81 1220 34 55 1160 32 8...

Страница 22: ...e 27 Electrical WARNING ELECTROSTATIC DISCHARGE ESD Precautions and Procedures Electrostatic discharge can affect electronic components Take care during unit installation and service to protect the un...

Страница 23: ...operly grounded in accordance with national and local codes Accessory Terminals One line voltage EAC 1 4 spade terminal is provided on the furnace integrated control See figure 30 for integrated contr...

Страница 24: ...on or appro priate dual fuel thermostat instructions Indoor Blower Speeds 1 When the thermostat is set to FAN ON the indoor blower will run continuously on the fan speed when there is no cooling or he...

Страница 25: ...to activation of combustion air inducer 12 Flame Sensed without gas valve energized 13 Low Line Voltage Note 1 Notes Note A Heartbeat is indicated by a Slow Flash 1 sec on 1 sec off repeating Note Las...

Страница 26: ...l electrical power to the unit 4 This furnace is equipped with an ignition device which automatically lights the burners Do not try to light the burners by hand 5 Remove the upper access panel 6 Move...

Страница 27: ...ve temporary gas meter if installed NOTE To obtain accurate reading shut off all other gas appliances connected to meter Supply Pressure Measurement A threaded plug on the inlet side of the gas valve...

Страница 28: ...ricifice Kit Natuarl Gas Orifice Kit 045 0 4500 ft 4501 7500 ft 7501 10 000 ft 7501 10 000 ft 0 7500 ft 7501 10 000 ft 0 7500 ft 070 No Change 80W52 80W51 73W37 11K49 73W81 73W81 110 80W52 80W51 090 8...

Страница 29: ...gas line pressure After one hour of continuous thermostat demand for heat the Watchguard will re set and remake thermostat demand to the furnace and automatically reset the integrat ed control to begi...

Страница 30: ...erating range Thermal Limits should be checked by restricting airflow and not disconnecting the indoor blower For additional details please see Service and Application Note H049 2 Verify that system t...

Страница 31: ...Page 31 EL180UHE BURNER ASSEMBLY REMOVAL Manifold And Gas Valve Retention Rings Cross Over Ignitor Sensor Rollout Switches Burner Detail Front View Figure 33...

Страница 32: ...service agency or gas supplier Cabinet Parts Upper access panel Blower panel Top cap Control Panel Parts Transformer Integrated control Door interlock switch Circuit breaker Blower Parts Blower wheel...

Страница 33: ...sted Supply Line Pressure W C ________ 1 VENT EXHAUST PIPE Secure to Unit Elbows Secured to Pipe Vent Pipe Supported 2 Roof Flashing water tight 3 DUCT SYSTEM SUPPLY AIR DUCT Sealed Insulated if neces...

Страница 34: ...___ 5 COOLING MODE INDOOR BLOWER AMPS______ 3 TEMPERATURE DROP Return Duct Temperature _________ Supply Duct Temperature _ _______ 4 5 6 7 DRAIN LINE Leak Free THERMOSTAT Adjusted and Programmed Opera...

Отзывы: