 5– “24V” Terminal

Terminal “24V” receives 24VAC from the control
transformer through the defrost thermostat. This
terminal powers the control’s internal timer and
relays. Terminal “24V” is powered only when there
is a call for defrost (defrost thermostat closed). The
timer begins timing at 0 only after terminal “24V”
receives power.

 6– “OUT” Terminal

Terminal “OUT” controls defrost when connected

to one side of the defrost relay coil. An internal
relay connected to terminal “OUT” closes to allow

external defrost relay to energize and initiate
defrost. At the end of the defrost period, the

internal relay connected to terminal “OUT” opens
to de-energize the external defrost relay.

 7– “TST” Pins

Each board is equipped with a set of test pins for
use in troubleshooting the unit. When jumpered

together, these pins reduce the control timing to
about 1/256 original time (see table 3 and figure 6).

IMPORTANT

Control will begin test mode only if normal load is
applied to control terminals. Do not attempt to
operate or test control out of unit.

A defrost period can last up to 14 minutes and can be
terminated two ways. If the defrost thermostat does
not open within 14 minutes after defrost begins, the
timer will de–energize the defrost relay and the unit
will resume normal operation. If the defrost
thermostat opens during the 14 minute defrost period,
the defrost relay is de–energized and the unit resumes
normal operation. Refer to figure 7.

FIGURE 6

WARNING – AVOID CONTACT WITH OTHER CONTROL

TERMINALS OR CONTROL COMPONENTS.

TO PLACE CONTROL IN TEST MODE:

 1– Turn off all power to avoid damaging the circuit board.
 2– Make sure all control terminals are connected as shown on

unit wiring diagram before attempting to place control in
test mode. See NOTE below.
NOTE – Control will not go into test mode when discon-
nected from unit. Unit load must be applied to control termi-
nals before the control will go into test mode.

 3– Connect jumper to “TST” pins as shown.
 4– Turn indoor thermostat to heat mode and adjust to highest

temperature setting.

 5– Turn on power to unit.
 6– See Table 3 for control timings in “TST” mode.
 7– Be sure to turn off power and remove jumper when test is

complete. Turn on power and re–adjust thermostat.

DEFROST CONTROL TEST MODE

ÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉ

ÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉ

ÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉ

ÉÉÉÉÉÉÉÉÉ

ÉÉÉÉÉÉÉÉÉ

ÉÉ

ÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉ

ÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉ

ÉÉÉ

ÉÉÉ

ÉÉÉ

ÉÉÉ

ÉÉÉÉÉÉÉÉÉ

ÉÉÉÉÉÉÉÉÉ

ÉÉÉÉÉÉÉ

ÉÉÉÉÉÉÉ

ÉÉÉÉ

ÉÉÉÉ

ÉÉÉÉÉÉÉÉÉ

ÉÉÉÉÉÉÉÉÉ

ÉÉÉÉÉÉÉ

ÉÉÉÉÉÉÉ

ÉÉÉÉÉÉÉÉÉÉÉÉ

ÉÉÉÉÉÉÉÉÉÉÉÉ

ÉÉ

ÉÉ

ÉÉ

ÉÉ

CLOSED, ON

OPEN, OFF

THERMOSTAT DEMAND

DEFROST THERMOSTAT

DEFROST RELAY

DEFROST THERMOSTAT

DEFROST RELAY

THERMOSTAT DEMAND

DEFROST THERMOSTAT

DEFROST RELAY

THERMOSTAT DEMAND

DEFROST THERMOSTAT

DEFROST RELAY

10HP SERIES UNITS TYPICAL DEFROST TIMINGS

NORMAL HEATING OPERATION: DEFROST TERMINATED BY DEFROST THERMOSTAT

NORMAL HEATING OPERATION: DEFROST TERMINATED BY TIME

NORMAL HEATING OPERATION INTERRUPTED BY THERMOSTAT DEMAND: “HOLD” FUNCTION

DEFROST PERIOD INTERRUPTED BY THERMOSTAT DEMAND: “HOLD” FUNCTION

30/60/90 MINUTES

“HOLD” TIME

“HOLD” TIME

14 MIN. PLUS “HOLD” TIME

30/60/90 MINUTES

DEFROST THERMOSTATOPEN WITHIN 14 MINUTES

30/60/90 MINUTES

14 MIN.

30/60/90 MINUTES

30/60/90 MINUTES PLUS “HOLD” TIME

Note – Control begins timing at 0 when defrost thermostat closes. Defrost is terminated when defrost

relay is de–energized. Anytime defrost thermostat opens, defrost relay is immediately de–energized,

defrost timer resets and “HOLD” function stops.

DEFROST THERMOSTAT

MUST REMAIN CLOSED

FOR TIMER TO REMAIN

IN “HOLD”

DEFROST THERMOSTAT

MUST REMAIN CLOSED

FOR TIMER TO REMAIN

IN “HOLD”

FIGURE 7

ÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉ

THERMOSTAT DEMAND

Содержание Diplomat 10HP12

Страница 1: ...ble in sizes ranging from 1 through 5 tons This manual is divided into sections which discuss the major components refrigerant system charging procedure maintenance and operation sequence Canadian spe...

Страница 2: ...breaker size amps 35 35 40 50 60 Minimum circuit ampacity 21 5 21 3 25 0 32 2 40 2 Refer to National Electric Code manual to determine wire fuse and disconnect size requirements NOTE Extremes of oper...

Страница 3: ...fan side and the compressor side of the capacitor have different MFD ratings See table 1 for dual capacitor ratings TABLE 1 Unit MFD VAC 10HP C12 DUAL CAPACITOR RATING 10HP18 24 and 30 2 10HP42 10HP4...

Страница 4: ...ents 1 Timing Pins 30 60 90 Each of these pins provides a different timed interval between defrosts A jumper connects the pins to circuit board pin W1 Table 3 shows the timings of each pin The defrost...

Страница 5: ...r to avoid damaging the circuit board 2 Make sure all control terminals are connected as shown on unit wiring diagram before attempting to place control in test mode See NOTE below NOTE Control will n...

Страница 6: ...DE ECCENTRIC ROTARY COMPRESSOR INTERNALS ROTOR SHAFT Figure 10 illustrates the four steps in a rotary compressor s continuous intake cycle The spring loaded blade is compressed fully at the beginning...

Страница 7: ...re 13 The reversing valve requires no maintenance It is not rebuildable If the reversing valve has failed it must be replaced If replacement is necessary access the reversing valve by removing the con...

Страница 8: ...he liquid line and vapor line service valves and gauge ports are accessible from outside of the unit Full service liquid and vapor line valves are used See figures 18 and 19 The service ports are used...

Страница 9: ...e stem cap with an adjustable wrench 2 Using service wrench backseat valve a Turn stem counterclockwise until backseated b Tighten firmly 3 Replace stem cap finger tighten then tighten an additional 1...

Страница 10: ...L10 41 50 20 30 40 50 3 8 3 4 3 4 3 4 3 4 3 8 3 8 3 8 10HP30 10HP36 L10 65 30 L10 65 40 L10 65 50 30 40 50 3 8 7 8 7 8 7 8 3 8 3 8 10HP42 10HP48 10HP60 Not Available 3 8 1 1 8 Field Fabricate LINE SET...

Страница 11: ...ATOR 10HP42 48 AND 60 ONLY DEFROST SWITCH S6 FILTER DRIER W INTERNAL CHECK VALVE MUFFLER LIQUID LINE FROM INDOOR COIL TO OUTDOOR COIL DISCHARGE LINE SERVICE PORT STRAINER LIQUID LINE SERVICE PORT REVE...

Страница 12: ...n to center port of gauge manifold 2 Open high pressure valve on gauge manifold and pressurize line set indoor coil to 150 psig 1034 kPa 3 Check lines and connections for leaks 4 Release nitrogen pres...

Страница 13: ...eways until liquid pressures in the 200 250 psig range are reached Block outdoor coil one side at a time with cardboard or plastic sheets until proper testing pressures are reached BLOCKING OUTDOOR CO...

Страница 14: ...Read liquid line pressure and convert to condensing temperature using temperature pressure conversion chart Condensing temperature read from gauges should be a few degrees warmer than the liquid line...

Страница 15: ...TB1 is energized initiating first stage heat from indoor unit 14 If outdoor temperature is below the balance point N O low ambient cut in thermostat S23 will close 15 When S23 is closed W2 of indoor...

Страница 16: ...Page 16 10HP WITH ELECTROMECHANICAL THERMOSTAT...

Отзывы: