Page 41
(Unit shown in upflow position with remote trap)
*5’ max.
To Drain
PVCPipeOnly
FieldProvidedVent
Min. 1” AboveCondensate
DrainConnection
1” Min.
Trap Can Be Installed a
Maximum 5’ From Furnace
2” Max.
CONDENSATE TRAP LOCATIONS
*Piping from furnace must slope down a
minimum 1/4” per ft. toward trap
FIGURE 43
Furnace With Evaporator
Coil Using A Separate Drain
Condensate
DrainConnection
Field Provided Vent
(1” min. 2” max. above
condensate connection)
Evaporator drain
line required
(Trap at coil is optional)
FIGURE 44
HorizontalFurnace4” Min. to 5” Max.above
condensatedrain connection)
FurnaceCondensate
DrainConnection
From Evaporator Coil
Optional
Condensate Trap With Optional Overflow Switch
FIGURE 45
Содержание 5625717
Страница 53: ...Page 53 VII Wiring and Sequence of Operation...