10
2.5.
COMPULSORY SPACE TO BE LEFT AROUND THE UNIT
The unit’s location must allow access for the relevant technical and maintenance service to be carried out, in
compliance with all the safety requirements applicable in the country.
It must be installed in places where good ventilation and air circulation is guaranteed. It must have a
minimum clearance of 0.3m.
Must be installed only on horizontal walls (on the roof)
The minimum recommended insulation thicknesses for the unit are:
-Refrigeration: 60mm
-Freezing: 100mm
2.6.
ASSEMBLY
A)
Must be installed only on horizontal wall (on the roof). Make a hole in the roof of the cold room,
depending of the model, of adequate dimensions HxL, as indicated in the table below.
B)
Raise the unit using the most suitable means, placing it against the hole in the cold room, insert it
from the outside, leaving out the condensing part.
C)
Fix the unit to the roof.
D)
Seal the panel cutting perimeter. To prevent leaks of hot air from the outside.
E)
When the condensation is by water, make sure that the pipes are not smaller than the diameter of
the equipment, complying with the entry and exit instructions.
CAUTION
The water supply temperature for water condensation must be between 10ºC and 20ºC and its
pressure between 1 and 5 bar. The installation of water should be protected from low outside
temperatures. Make sure NEVER close the water supply while the equipment is running.
Содержание MONOTOP R290
Страница 2: ......
Страница 27: ...26...
Страница 28: ...LENNOX EMEA reserves itself the right to make changes at any time without preliminary notice www lennoxemea com...