
MAINTENANCE OF ROUND BALE WRAPPER
LELY WELGER
y
RPC 445 Tornado
127
11.4 Screw
check
Note!
After the first 20 running hours: retighten all fastening screws
and nuts of the machine. Adjusting screws must not be
changed.
After the first 20 running hours:
Retighten all fastening screws and nuts – also inside the
machine –. Exception: do not change any adjusting screws.
11.5 Winter
pause
Prior to a winter pause:
Place the machine on an even surface to avoid frame
tension.
If the machine is stored in winter with the wrapping ring
folded up: secure the wrapping ring hydraulically and, in
addition, mechanically against lowering (see chapter
"Wrapping Ring Safeguard", page 28).
Remove film and straw remains from the machine.
Thoroughly lubricate all bearing points.
Slightly oil the film knife.
Remove film rolls.
Lubricate film knife, bale transfer unit and wrapping table.
Disconnect PRO-LINK control box from the machine (pull
off the plug) and store it at room temperature.
(See also: chapter "Winter pause", page 106.)
Содержание RPC 445 TORNADO
Страница 2: ......
Страница 124: ...MAINTENANCE BALER 116 LELY WELGER y RPC 445 Tornado 10 19 Hydraulic System Complete Machine Figure 100...
Страница 125: ...MAINTENANCE BALER LELY WELGER y RPC 445 Tornado 117 Figure 101...
Страница 131: ...MAINTENANCE BALER LELY WELGER y RPC 445 Tornado 123 10 23 2 Control electronics SG 2 A B...
Страница 132: ...MAINTENANCE BALER 124 LELY WELGER y RPC 445 Tornado 10 23 3 Control electronics SG 3 A B...
Страница 144: ......