56
Instructions for Use, V2.0, RevG - 07/2016
Unload station
• There is a maximum of four unload stations (
E25
-
E28
) -
E25
being non-
changeable. Unload stations do not have a bar on the left border.
• Completed racks are placed into the unload stations by the transfer
arm, always starting with station
E25
. Line 2 shows which program has
been completed, line 3 shows the rack number. The colored program
indication blinks in two-second intervals.
Reagent station
• If the
RMS
(
R
eagent
M
anagement
S
ystem) is ON, the bars at the left
border of each reagent station indicate reagent life.
The higher the bar, the more time is still left until the reagent needs to
be changed.
• If one of the set parameters (Days max., Racks max.) has been exceed
-
ed, the bar blinks in two-second intervals.
Assigning the reagent
• Select a reagent station (via the corresponding button), and press the
REAGENT LIST
button in the
STATION DETAILS
menu (
Fig. 51
).
• Select the required reagent in the table (see
Fig. 42
) and press
CON-
FIRM
. The selected reagent is now assigned to the station and entered
in the RMS protocol.
Water station
• If a bar is being displayed on the left, the station is ready for use.
• The color of the bar changes as follows:
- blue bar: water entering into and exiting from the station
- white bar: water in the station is not running
• The water flow is controlled automatically.
Oven station (optional)
• If a bar is being displayed on the left, the station is ready for use.
• The color of the bar changes as follows:
- red bar: oven heating up to set temperature.
- white bar: oven not heating.
• The heater function is controlled automatically.
RMS off
RMS on
5. Operation
Содержание ST5020
Страница 2: ......
Страница 90: ...90 Instructions for Use V2 0 RevG 07 2016 Notes...
Страница 91: ......