67
Checking Line and Grade
8
Checking Line and Grade
Line and Grade should be checked after the first 7.5 to 15 meters (25 to 50
feet) of pipe is laid to ensure the pipe is at the proper grade and line.
Checking Line and Grade
•
Set up a transit or automatic level as shown in the illustration.
•
Take grade readings at the ends of the pipe using a grade rod.
B
A
C
Содержание PIPER 100
Страница 1: ...Leica PIPER 100 200 User manual Version 3 0 English...
Страница 6: ...6 11 Technical Data 75...