
34
18. Ensure adequate clearance between drive
shaft and swingarm tunnel.
19.
See Fig. 8
. Install (2) u-bolts, (4) lock washers
and (4) nuts to install yoke to pinion shaft.
20. Tighten bolts using 1/2” wrench. Be sure to
tighten both sides equally from both side to
side and top to bottom.
21. Torque u-bolts to
20 ft-lbs.
CAUTION: Do not over-tighten u-bolts. The
bearing cups may distort, causing prema-
ture joint failure or u-bolts may break.
22. Reconnect braided brake line to brass “T.”
Torque banjo bolt to
16 ft.-lbs
.
23. Fill brake fluid reservoir with DOT 4 brake fluid.
24. Secure left side braided brake line and park
brake cable to left side of swingarm using (3)
black zip-ties.
25.
See Fig. 9
. Secure vent tube and park brake
cables using (3) high-temp zip-ties.
26.
See Fig. 10
. Secure vent tube using (2) black
zip ties.
27. Re-attach electrical box.
28. Install new cable ties to attach brake lines to
swingarm.
29. Install park brake bracket to frame rail.
30. Install park brake bracket hardware.
31. See “R & R Exhaust” for reinstallation proce-
dure.
32. See “R & R Body” for re-installation procedure.
33. Install rear wheels.
34. Torque lug nuts to
75 ft.-lbs.
Fig. 8
Install u-bolts
Fig. 9
High-temp. cable ties
Fig. 10
Black cable ties
R & R SWINGARM CONTINUED
Содержание TRAMP 2009
Страница 44: ...u_joint_gu1072 jpg dust_shield_yoke_ls1420 jpg badge_tramp_gb1322 jpg grab handle_lh6202 jpg ...
Страница 46: ...swingarm_ls6200 jpg heat_shield_ls6209 jpg bracket_parkbrake_exhaust_s001361 jpg bracket_muffler_s001362 jpg ...
Страница 49: ...debris_shield_differential_ls1018 jpg shaft_drive_ls1404 jpg yoke_ly1002 jpg cable_park_brake_GB1115_16 jpg ...
Страница 50: ...badge_25year_s001532_REV_00 jpg latch_striker_ls6208 jpg ...