background image

HP-4 Wet Location Surface Mount Installation Instructions

3 of 9

© 2019 FINELITE, INC. ALL RIGHTS RESERVED.   Form - 98439. V2   EFFECTIVE DA

TE: 09/09/19

ABC Corporation - A12345

HP-4 WL SM - 32' - S - 835 - F - 120V - SC - C4

HP-4 WL SM - X'

ID: 1

STARTER

Factory Order 

Number

Job Name

Unique Luminaire

ID Number

Full Catalog 

Order ID

Luminaire 

Section Type

Luminaire Type 

and/or Run Length

Yoke Bracket

#10-32 x 5/8" Screw

Part# 45042

Part# 43695

Mounting Starter to Structure 

p. 5, Step 4

Part# 43696

Mounting Starter to Structure 

p. 5, Step 4

Part# 94144 

Securing Luminaire Joints 

p. 8, Step 6

Part# 76407 

Mounting Starter to Structure  

p. 6, Step 4

Joint Luminaires

p. 7, Step 5

Part# 43637 

Identification & Preparation 

p. 3, Step 2

Part# 76404 

Identification & Preparation 

p. 3, Step 2

Closing Luminaires 

p. 9, Step 7

Part# 43738 

Identification & Preparation 

p. 3, Step 2

Closing Luminaires 

p. 9, Step 7

Part# 43694 

Mounting Options & Locations 

p. 2, Step 1

Identification & Preparation 

p. 3, Step 2

Part# 43740 

Identification & Preparation 

p. 3, Step 2

Closing Luminaires 

p. 9, Step 7

Step 2 - Identification & Preparation

A. Identify Luminaires

• 

Identify all luminaires by their ID label that can be found on the box, the diffuser and 

inside the luminaire.

• 

NOTE: Exact location of labels in these areas may vary.

• 

Remove all luminaires from their box.

• 

Refer to record drawings that can be found in the hardware kit.

Kitted Hardware

• 

Finelite has provided items 

listed here, with their 

Finelite part numbers. 

These items can be found 

in separate boxes shipped 

with the luminaire.

• 

Account for all parts 

and set aside until they 

are needed.

• 

All other hardware needed 

for this installation will be 

by others.

B. Remove Endcap & Joint Diffuser Covers

• 

Remove the magnetic screw cover from endcap and joint diffuser cover.

• 

Carefully remove ALL endcap and joint diffuser covers. Failing to do so will result in 

damage to gaskets.

• 

Set aside the screws, endcap and joint diffusers covers to prevent from getting damaged.

Screw Cover

(provided)

Screw Cover

(provided)

Joint Diffuser Cover

(provided)

Endcap Diffuser Cover

(provided)

#6-32 x 3/8" Screw

(provided)

#6-32 x 3/8" Screw

(provided)

  C. Remove Diffusers & Grommets at Required Locations

• 

Carefully remove all diffusers, keeping them inside their protective bags.

• 

Set aside all diffusers to prevent from getting dirty or damaged.

• 

Ensure diffusers can be clearly identified back to its corresponding luminaire.

• 

Use a flathead screwdriver to remove grommets at required mounting hole locations.

Backplate

Diffuser

Protective Bag

Grommet (provided)

ID Labels

1/4"-20 Sealing Washer

Screw Cover

#6-32 x 3/8" Screw

Endcap Diffuser Cover

Grommet

Joint Diffuser Cover

Nylon Nut

CAUTION

Arrange luminaires in order according 

to ID# at their install locations.

Sealing O-Ring

Содержание Finelite HP-4

Страница 1: ...oceeding All power connections should be installed according to local national codes by a Certified Electrician This installation requires proper support as each luminaire is being installed DO NOT attempt to join luminaires together on the floor Damage may result when lifted NOTES HELPFUL VIDEOS 0 10V Dimming Simple Plug Together Wiring Effortless Access Step 2 Identification Preparation Page 3 S...

Страница 2: ...t required mounting hole locations Option 2 Mount to Support Structure Install wet rated electrical junction box and wet rated electrical conduit at feed locations Remove preinstalled grommets to use mounting holes NOTE Only remove grommets at required mounting hole locations Step 1 Mounting Options Locations Mounting Locations X Luminaire section length X Measurements do not include endcaps or jo...

Страница 3: ...minaires from their box Refer to record drawings that can be found in the hardware kit Kitted Hardware Finelite has provided items listed here with their Finelite part numbers These items can be found in separate boxes shipped with the luminaire Account for all parts and set aside until they are needed All other hardware needed for this installation will be by others B Remove Endcap Joint Diffuser...

Страница 4: ...nts Release the backplates from clips by sliding the blade of a putty knife behind backplate edges To use a flathead screwdriver From inside backplate press end of screwdriver against the clip until the backplate is released Carefully rotate all backplates out and let them hang from luminaire body Release Backplates Backplate Putty Knife Option Putty Knife Clip Backplate Backplate Flathead Screwdr...

Страница 5: ...nd Grey Dimming 0 10V DC Purple Dimming 0 10V DC Install conduit sealing o ring and nylon nut onto the luminaire Wire nut electrical connections See wiring legend above Flex Conduit by others Nylon Nut provided Ceiling Nylon Nut provided CRITICAL If luminaire contains a sensor refer to Sensor Addendum before mounting starter to structure While properly supporting luminaire maneuver luminaire near ...

Страница 6: ...threaded rod CRITICAL If installing a joiner luminaire in the next step leave nut loose allowing luminaire to hang at an angle If there is no joiner ender then tighten nuts fully PROCEED TO STEP 7 Option 2 Mount to Structure Place luminaire onto wall ceiling and mount to structure support with hardware appropriate for the structure type CRITICAL If installing a joiner luminaire in the next step le...

Страница 7: ...ether Be careful not to damage any wiring If necessary lift both luminaires then slide them together Option 2 Mount to Structure Mount to structure support with hardware appropriate for the structure type NOTE If installing a joiner luminaire leave nut loose allowing luminaire to hang at an angle If there is no joiner ender then tighten nuts fully B Join Luminaires CAUTION Once luminaires are alig...

Страница 8: ...Yoke Brackets Before installing yoke brackets ensure the joining ends of luminaires meet flush and square CRITICAL Ensure yoke brackets properly engage with aligner sleeves Secure joint by threading but not yet tightening yoke screws through yoke brackets and into the aligner sleeves Tighten yoke screws until joint seam of luminaires is closed Joiner Ender Cross Section View Starter Yoke Screw pro...

Страница 9: ...otating into luminaire body and snapping back into clips Remove diffusers from protective plastic bag CAUTION Wear gloves to keep diffuser surface clean take care to wipe off any water or condensation on diffusers before installing into luminaire CRITICAL Be sure to install correct diffuser to its corresponding luminaire ID Install diffusers into luminaire body ensuring they snap into place Reinst...

Отзывы: