Installation Instructions
LFE1U
9
9.
Remove back cover to expose control box. (See Figure 6)
10. Route control pad cable (D) behind bottom back cover (A1)
and into port A1 on control box.
(See Figure 6) and (See
Figure 7)
11. Route motor cable (E) behind bottom back cover (A1) and
into port 1 on control box.
(See Figure 6) and (See
Figure 7)
NOTE:
Bottom back cover (A1) may need to be pulled back or
loosened in order to fit cables behind it.
NOTE:
Use cable ties (K) and pre-installed cable clips to
provide tension relief.
NOTE:
Knockout holes can be created on A1 bracket for
another cable routing option. (See Figure 7)
Figure 6
IMPORTANT ! :
Lower cover (A2) should only be
installed after all cables have been routed with no load.
12. Slide lower cover (A2) onto column assembly (P) and use
two 8-32 x 3/8" Phillips pan machine screws (F) to secure
bottom back cover (A1) to lower cover (A2). (See Figure 7)
Figure 7
13. Plug in power cable (V) to control box and route along side
of control box. Provide strain relief using the cable ties (K)
and cable clips. All three cable clips MUST be used to
prevent cable from rubbing against lower edge of cover!
(See Figure 8)
Figure 8
14. Plug in power cable (V) to outlet.
15. Press and hold "DOWN" button for three seconds to
initialize lift mechanism. (See Figure 9)
16. Press and hold "UP" button until mount reaches it’s
maximum height. (See Figure 9)
NOTE:
If lifting mechanism does not function properly refer to
"Troubleshooting" Section.
Figure 9
(D)
10
9
(C)
(E)
into port "A1"
into port "1"
11
(K) x 4 for tension relief
(as needed)
(A2)
12
12
(A1)
(F) x 2
12
knockout
holes
control box
13
required clip
locations
"UP"
"DOWN"
"PRESETS" "SAVE"
Содержание Chief LFE1U