13
STYLE™
foundation
design
99301567-d
POWER DOWN OPERATION
To lower the base to the
fl at
position during an electrical power outage, complete the following procedure:
STEP 1
Locate (1) power down box (
FIGURE 8
). Install (2) 9 volt batteries
(not included) in power down box (
FIGURE 8
).
STEP 2
Press the lowering button on the power down box (
FIGURE 8
) to
lower the base to the fl at position.
FIGURE 8
POWER
DOWN BOX
LOWERING
BUTTON
INSTALL (2) 9
VOLT BATTERIES
(NOT INCLUDED)
STEP 3
Remove two (2) 9 volt batteries from power down box. When power
is restored from outage, base is ready to resume normal operation.