Y-120 K/CK Adjustable Base Owners Manual 290-0089
6
INSTALLATION
For installation and setup of the adjustable base, complete the following procedures, in the
order indicated below and on the following pages.
STEP 1
Place adjustable base shipping container on solid, level
surface. Remove top section of shipping container.
Remove packing material. Carefully, lift adjustable
base out of bottom section of shipping container and
place on clean surface.
Note: Allow for enough space to
unfold base in setup area.
Unfold base until flat.
Remove hardware/leg boxes. Before discarding
any packing materials, open the adjustable base
shipping carton and verify the following items are
included:
t #FEMFHT
t 3FNPUF$POUSPM
t 1PXFS4VQQMZ
t 1PXFS%PXO%FWJDF OPUTIPXO
t #PMUT
t $BQUJWF1JOT
t .BUUSFTT3FUBJOFS DVU[JQUJFUPSFNPWF
t 8BSSBOUZ"DUJWBUJPO$BSE OPUTIPXO
t 2VJDL4FUVQ(VJEF OPUTIPXO
DUE TO RISK OF INJURY, TWO ADULTS
ARE REQ UIRED TO HANDLE AND MOVE
ADJUSTABLE BASE.
WARNING
WARNING
READ ALL INSTRUCTIONS BEFORE USING
PINCH POINT!
KEEP HANDS AND FINGERS CLEAR OF
HINGES DURING UNFOLDING OF BASE.
WARNING
WARNING
REMOTE
CONTROL
POWER
SUPPLY
BOLTS AND
CAPTIVE PINS
MATTRESS
RETAINER
LEG
(6 pieces)