background image

PAGE 17

If the batten does not touch the two bumpers equally, loosen the bolts of the

batten sley and batten handtree and exert pressure on the batten centering it in its

proper place. Tighten the bolts again while keeping pressure in the batten.

Содержание 1009-0000

Страница 1: ... and lay out the loom components Do NOT discard any packing material until all parts are inventoried Check the parts received against the parts list on pages 2 to 5 of the assembly instructions Report any discrepancies to Leclerc or your dealer immediately 1972 Avenue Simoneau C P 4 Plessisville Qc G6L 2Y6 TEL 819 362 7207 FAX 819 362 2045 www leclerclooms com leclerc leclerclooms com ...

Страница 2: ...E LOWER CROSS MEMBER 6 TREADLES 1 Treadle set rod with one push nut 14 1 More treadle push nut 2 TREADLE set SUPPORTS PARTS LIST 4s PAGE 2 Note for Leclerc in French Surveiller l amanchement avec les pattes avant Note for Leclerc in French Trous de bout avec mèche 17 64 ...

Страница 3: ... DRUM 1 TAKE UP MOTION HANDLE 1 CASTLE TOP COVER SHELF 1 BATTEN HANDTREE 1 BATTEN SLEY WITH SHUTTLE RACE 2 BREAST BEAMS 1 JACK BOX WITH 4 LAMS DO NOT REMOVE THE TAPE UNTILL IT IS INSTALLED IN THE LOOM PARTS LIST 4s PAGE 3 1 DOZ BOBINES 4 Note for Leclerc in French Vérifier si le crochet à ros passe bien dans les trous des contremarches ...

Страница 4: ...1 REED 2 LEASE STICKS 1 BEAM STICK 3 WARP RODS 1000 HEDDLES 1 HEDDLE AND REED HOOK 1 Multi bits Screwdriver 1 Adjustable Wrench 6 TREADLE HOOKS 7 LONG 12 TREADLE CORDS 7 LONG 1 CRANK FOR BACK BEAM PARTS LIST 4s PAGE 4 10 10 ...

Страница 5: ...anvas 1 book Warp Weave 1 VHS Video cassette mounting instructions PAGE 5 Carriage Bolts 2 X 3 6 mm x 80 mm 2 X 3 6 mm x 75 mm 2 X 1 6 mm x 45 mm 4 5 16 X 2 8 mm x 65 mm Nuts 3 6 mm lam treadle cross member 2 5 16 8 mm batten handtree Wing nuts 4 6 mm treadle block 2 frame hooks 2 5 16 8 mm batten handtree Washers 4 5 16 8 mm batten 5 6 mm 2 9 16 15 mm treadle block Wooden spacer 5X 1 ...

Страница 6: ...6 Using a 2 50 mm round headed screw no 14 affix the lower middle cross member B to the bottom of left hand side A The lower middle cross member has a hole at either end the narrow sides B1 must be above and under the cross member and the wide faces B2 must be on the sides Loom Left Side ...

Страница 7: ...eft hand side A Using a x 1 6mm x 45mm carriage bolt and a 6mm wing nut affix metal hook C to left hand side front post D Using a x 1 6mm x 45mm carriage bolt and a 6mm wing nut affix metal hook C to right hand side front post D PAGE 7 ...

Страница 8: ...ber B Place the take up motion handle E on the right hand side of cloth beam F NOTE The ratchet gear is on the right hand side beam end The ratchet pawl P affixed to the brake lever must be lifted up Insert the end of cloth beam F into the holes in upper front cross members G and G PAGE 8 P ...

Страница 9: ...Using two 2 50 mm round headed screws no 14 affix one of the two breast beams to the top of the front posts B and B PAGE 9 ...

Страница 10: ...uare nuts attach treadle set cross member A to front posts B and B Insert two x 3 6 mm x 75 mm carriage bolts into treadle set cross member A The bolt heads must be to the underside The 2 center holes are for a 6 treadle set and the 2 outside ones are for the 10 treadle set ...

Страница 11: ... D 1 Washer 9 16 One treadle and one treadle spacer 5 times One treadle One Washer 9 16 and one Push nut PAGE 11 Put the treadle support on each side and install it on the loom using one 6 mm washer and one 6 mm wing nut Washer 9 16 Push Nut ...

Страница 12: ...PAGE 12 Unfold the back portion of the loom and lock it there with metal hook A ...

Страница 13: ...to top and affix it to blocks C and C using eight 1 40 mm round headed screws no 12 PAGE 13 The tape Saran Wrap holding the jack box must now be removed The ratchet pawl Q affixed to the side of the loom must be lifted up while inserting the Jack Box Q ...

Страница 14: ...PAGE 14 Using a 1 4 x 3 6mm x 75mm machine bolt one washer and a 1 4 square nut affix the four lams B to metal lam support C of the right hand side main post A Washer 6mm s ...

Страница 15: ...t frames must rest on the plastic supports of the jacks shaft guides The Leclerc Logo must be on top facing the front of the loom NOTE Some shafts may be tight between the castle frame until the castle top is affixed Using two 1 40 mm flat headed screws no 12 affix castle top on top of middle wide post castle PAGE 15 ...

Страница 16: ...uare nuts attach the batten sley A with shuttle race to the batten swords B Then affix the batten handtree C to the batten swords B Install reed D in the slots of batten handtree C and batten sley A Adjust batten handtree C by sliding the bolts in the slots of the batten swords to firmly hold the reed ...

Страница 17: ... does not touch the two bumpers equally loosen the bolts of the batten sley and batten handtree and exert pressure on the batten centering it in its proper place Tighten the bolts again while keeping pressure in the batten ...

Страница 18: ...p slightly to the rear of the loom Insert one end of the warp beam which has only a metal post into the left hand side back post Insert the friction brake drum of the warp beam into the circular wire brake shoe D Do not unroll the brake shoe brake circle just slide the warp beam into it PAGE 18 ...

Страница 19: ...ke end of the warp beam into the hole of the right hand side back post Install the 7 16 X 3 machine bolt through the right hand side back post and into the warp beam Using crank E tighten the machine bolt into the warp beam ...

Страница 20: ...PAGE 20 Attach the end of circular brake shoe D brake circle to the hook of spring F Then attach cord C to the hook of brake treadle G See Warp and Weave book friction brake section page 87 ...

Страница 21: ...Using two 2 50 mm round headed screws no 14 affix one of the other breast beams to the top of the back posts PAGE 21 ...

Страница 22: ...hrough the Screw Eyes and Cord Loops FIRST TREADLE TIE UP Select any treadle and tie the Lams to it using the 7 cords supplied with the loom Take the heddle hook to help thread the cord through each hole of the lam LAM PAGE 22 ...

Страница 23: ...o ends equal in length of this cord through the middle holes of the warp beam Continue threading the cord through the warp beam and beam stick A Knot the cord at each end of the beam stick Adjust the cord so it is equally divided and keeps the beam stick straight This will reduce warp wastage ...

Страница 24: ...crew eyes have been affixed to the inner side of the main post Pass a string through the holes of the lease sticks then tie the ends to the thread beam and to the screw eye Do the same with the other ends of the lease sticks The lease sticks will now be held at a practical height for threading We at Leclerc encourage Weaver feedback on this and all our products Please send your comments to Leclerc...

Отзывы: