A  suitable  fire  extinguisher  should  always  be  available  and  sited 
close to the operation of the machine. 

 

Canisters should never be changed when the machine is on, or still 
hot enough to cause possible ignition. 

 

Should  a  canister  or  canister  base  fail,  such  that  leakage  occurs 
when  removing  the  canister,  DO  NOT  remove  it.  Re-tighten  the 
canister  and  leave  it  in  the  machine.  (Note:  there  will  always  be  a 
slight  hiss  when  removing  a  canister,  as  the  canister  valve  shuts, 
this is normal.) 
The machine can then be taken to a safe area where the canister can 
be safely removed, or the gas burnt off, whichever is deemed safe to 
do. The failure can then be investigated and corrected. 

 

 

Always be aware of the potential dangers involved in using a flame 
machine of this nature. In every instance of use the user should be 
confident that all possible scenarios involving safety issues are fully 
and confidently covered. 

 
 
 

Regularly test the operation of both solenoid valves. 
Recommended  procedure  is  outlined  below 

–  it  requires  program 

type 2 (PrG2, see page 10). The test should be given the same safety 
precautions as normal operation. 
Load the machine with fuel canisters and arm the unit. Open the firing 
(nozzle)  valve  without  opening  the  safety  (canister)  valve.  If  fire  is 
observed,  the  safety  valve  has  failed  in  open  state.  Close  the  firing 
valve.  Open  the  safety  valve.  If  fire  is  observed,  the  firing  valve  has 
failed in open state. Open the firing valve. Fire should be produced; if 
it is  not,  then  one  of  the  solenoid  has  failed in  a  closed  state.  If  this 
test is failed, the machine should be taken out of service immediately.  

 

Содержание Chameleon

Страница 1: ...ld there be any doubt as to the safety of operation of the machine under any circumstances the machine should be taken out of service immediately The Chameleon must not be used in confined spaces under any conditions of rain snow or precipitation of any fluids or moving air which will cause the flame to divert from a vertical path Warning Failure to observe correct operating procedures may lead to...

Страница 2: ...All operations should have undergone preliminary tests and rehearsal Should any conditions change that would indicate an unsafe operation an emergency shut down should be instigated E stop control should always be included in any installation format An absolute minimum guidance is a safety radius of 2m An absolute minimum guidance is a height safety distance of 8m These distances should not less t...

Страница 3: ... assessment Usage Compliance with Authority requirements Effect demonstration Approval Safety distances Fire prevention Fire procedures Emergency fail equipment and procedures These and local legislation must all be taken into account before the Chameleon can be used It must be stated that under no conditions should the Chameleon be modified or used in an exposed condition that might lead to injur...

Страница 4: ...ntial dangers involved in using a flame machine of this nature In every instance of use the user should be confident that all possible scenarios involving safety issues are fully and confidently covered Regularly test the operation of both solenoid valves Recommended procedure is outlined below it requires program type 2 PrG2 see page 10 The test should be given the same safety precautions as norm...

Страница 5: ...me solenoids and an external mains power output socket Channel is considered active when its value is raised to more than 50 Use of flash button is advised for the firing channel The Hot surface igniter will take approximately 10 seconds to reach the correct operating temperature after which flame operation will be allowed A flashing display indicates that this heating process is taking place The ...

Страница 6: ...reset in order to resume operation The Chameleon is supplied set to PrG 2 mode whereby separate DMX channels control the two solenoids Hsi channel1 Nozzle solenoid channel2 Canister Beacon output channel3 Please refer to the Program Type information at the end of this document if the alternate mode is required ...

Страница 7: ...as hot as the flame itself so the height adjustment must also take this into consideration Under no circumstances should any foreign body or chemical be introduced into the flame itself this is potentially very dangerous There are no user serviceable parts within the Chameleon system and any faults should be dealt with by a qualified engineer or the unit should be returned to the manufacture forre...

Страница 8: ...smitting before the unit is switched on The Hot surface igniter should be activated until the control display stops flashing then the flame channel s activated If fluid remains in the system this will be burnt off When viewing the Hot surface igniter stay at least 3 metres from the machine After all fluid has been burnt off solenoids can be heard to click on flame activation Attach a mains driven ...

Страница 9: ... button will cycle through these events UP and DOWN buttons allow each address to be adjusted to suit the user These addresses are not allowed to be equal or more than 256 steps apart A warning will be given on the display to reset these values should this occur Whilst in the mode of setting addresses the STORE VIEW button will place these values in memory When the DMX mode is selected for receivi...

Страница 10: ...d Pressing Up and Down then toggles the Tilt Switch on or off Purge Setting This allows solenoid action with no Hot surface igniter action Where gas can be issued safely this mode allows the system to be purged of gas The Hsi will be disabled to prevent flames To access this mode reduce the above delay setting to below 10 Remember to return the delay setting value to its original value and store i...

Страница 11: ...above purge mode Hardwiring of the solenoids to the PCB connectors must be altered depending on what program is selected Wiring Nozzle Solenoid to Sol Fl connection on the PCB Canister Solenoid and Beacon wires to the Beacon connection on the PCB Service Note It is possible that under certain conditions of use a fine layer of evaporated coloured salts may build up on the one way valve discs within...

Страница 12: ...te although the machine should not be used below 5C if it is switched on when extremely cold there is a chance that the mains fuse may break due to large current peaks taken by the Hot Surface igniter under such conditions Replace the fuse with the same rating and wait until the machine has returned to normal working temperature conditions Contact Details UK Le Maitre Ltd 6 Forval Close Wandle Way...

Страница 13: ...13 Control Panel Layout ...

Отзывы: