FPV UPGRATION
1. Installation of VTX (KKT20-V200) (
replace the original fly Super_S F4 tower
M2*25 screws with M2*30 screws), and use spacers and screws to assemble the
VTX as shown in the figure below.
2. Install the camera (RunCam nano 2) with M2*3.5 screws, and mark the flight
control port connected in a red frame.
KKT20-V200
Содержание FLYBALL 230
Страница 5: ...Cut off the 3P plug and solder it to the programming lamp Marking of welding points ...
Страница 13: ...RECEIVER CONNECT 1 S BUS and PPM receiver ...
Страница 14: ...2 iBUS receiver 3 DSM2 and DSMX receiver ...
Страница 15: ...BETAFLIGHT Please go to the Google App Store to download and install the BETAFLIGHT Assistant Software ...