7.Install the propeller correctly, pay attention to the direction of rotation of the propeller, and
sort out the connecting lines so that the rotation of the propeller should not be affected.
8.The installation of protective cover on upper flyball
11 black pentagons and 1
red pentagon form the
upper ball (if it is a red
ball, then it is 11 red and 1
white
Install the A-B tail lamp
socket, and fix the B socket
with M2*9 round head
screws and nuts
Содержание FLYBALL 230
Страница 5: ...Cut off the 3P plug and solder it to the programming lamp Marking of welding points ...
Страница 13: ...RECEIVER CONNECT 1 S BUS and PPM receiver ...
Страница 14: ...2 iBUS receiver 3 DSM2 and DSMX receiver ...
Страница 15: ...BETAFLIGHT Please go to the Google App Store to download and install the BETAFLIGHT Assistant Software ...