Installation
36
INSTALLATION, MAINTENANCE AND USER' MANUAL
549263_D_PUB_DATE_7_JUL_2014.DOC
Figure 12 – Rigid-mount machines
Figure 13 – Rigid-mount machines,
G, F – see table 22
Rigid-mount machines
MACHINE
A B C D E F G
H
18-24-28 kg / 40-55-65 lb
MEDIUM SPIN
8 / 18
522
20.55
474
18.66
69
2.71
139
5.47
57.5
2.26
660
25.98
670.5
26.39
-
11 / 25
615
24.21
474
18.66
67.5
2.65
139
5.47
57.5
2.26
750
29.52
670.5
26.39
-
14 / 30
615
24.21
574
22.59
67.5
2.65
154
6.06
57.5
2.26
750
29.52
785.5
30.92
-
18 / 40
751
29.57
569
22.40
69.5
2.74
220,5
8.68
50
1.97
890
35.04
838.5
33.01
82
3.23
24 / 55
751
29.57
714
28.11
69.5
2.74
220,5
8.68
50
1.97
890
35.04
984.5
38.76
82
3.23
28 / 65
751
29.57
789
31.06
69.5
2.74
220.5
8.68
50
1.97
890
35.04
1059.5
41.71
82
3.23
Table 22 – Rigid-mount machines, (dimensions stated in mm / inches)
Providing elevated concrete pad – rigid-mount machines
This method comes into consideration in case that the existing
floor is thinner than 120mm / 4.72”or in case that the machine
should be positioned above the existing floor level.
The height of the elevated pad could be 150-200 mm /
5.9-7.87”, see figure 12.
Procedure:
Break and remove the existing floor down to the depth of approx
75mm / 2.95", see figure 13. The longest dimensions of the lower
part of the hole must be by 120 mm / 4.72" longer
than the dimensions of the upper part of the hole.
G and F dimensions - see table 22.
Wet the complete hole and spread over with cement.
In order to increase the load-bearing capacity and reduce
the concrete deformations, we recommend inserting an armature
into the base of the pad. In order to achieve adequate connection
of the new pad with the existing floor, insert a reinforcing bar
or reinforcing bars.
o
NOTE:
When inserting the reinforcing elements, take into
consideration the locations (and space requirements) for drilling
holes which will be used for the chemical anchor bolts.
Pour concrete into the prepared base. Level the surface
carefully into a horizontal plane.
Let the concrete harden for at least one week before
installation of the machine.