Operation
549263_D_PUB_DATE_7_JUL_2014.DOC
INSTALLATION, MAINTENANCE AND USER' MANUAL
15
First service at technical problem
N°
Failure message
Failure
Action
Fault occurrence
E2
No Drain End
Drain failure
Full Stop + tumble
Draining
E3
Tilt Fault
Safety switch
activated
Full stop + tumble
Whole cycle, revolutions under
the distribution revolutions
level.
E4
Imbalance
Safety switch
activated during the
transition from
distribution into spin
sequence.
Skip + continue
Spin
E5
Tilt High Sp
Safety switch
activated at high
revolutions.
Full stop + safety time
High revolutions
E6
Door Switch
Door switch failure
Full stop + safety time
Whole cycle
E7
Door Coil
Door lock failure
Full stop + safety time
Whole cycle
E8
Door Start
Door lock failure in
the beginning of cycle
Don’t start
In the beginning of cycle
E9
Door End
Door lock opening
failure at the end of
cycle.
Don’t start
End cycle
E11
No Fill
Fill failure
Full stop + request for
Continue
While filling
E12
OverFill
Failure due to water
overfill (water level
above the pre-set
value)
Full stop + tumble
After filling or during the filling
procedure.
E13
No Heating
Heating failure
Full stop + tumble
While heating
E14
Heat. Time
Heating time failure
Full stop + request for
continue
While heating
E15
Too Hot
Too Hot
Full stop + tumble
While heating
E21
OverFlow
Water level too high
Full stop + tumble
After filling or during the filling
procedure
E24
Level Sens.
Defective level
sensor
Co Don’t start
Before start up
E25
Temp Sensor
Defective
temperature sensor
Co Don’t start
Before start up
E26
Mitsub. Code
Undefined frequency
inverter error code
Full stop + tumble
Whole cycle
E27
Invert.Com.
Communication fault
inverter
Full stop + safety time
Whole cycle
E28
THT time
THT Time out
Full stop + safety time
At spin sequence
E29
OV3/OP time
OV3 Time out / E.OP Full stop + safety time
At spin sequence
E31
Load Par
Initialization fault
frequency inverter
Don’t start
When setting up parameters