LAUNCH
X431 GDS Scopebox Manual
secondary-simultaneous ignition will be shown as Figure 4-8.
Fig.4-8
Fig. 4-9 below shows the valid and invalid ignition waveforms. Under
the working status of valid ignition, the breakdown voltage and spark
voltage are higher because the cylinder is filled with fresh
combustible mixture gas, which has a lower ionization level and vice
versa.
Содержание X431 Scopebox
Страница 29: ...LAUNCH X431 PAD Scopebox User s Manual 27...
Страница 30: ...LAUNCH X431 PAD Scopebox User s Manual Fig 4 12 28...
Страница 63: ...LAUNCH Android based Scopebox User s Manual...
Страница 64: ...LAUNCH Android based Scopebox User s Manual Fig 4 12...
Страница 78: ...LAUNCH X431 GDS Scopebox Manual Fig 3 8 3 3 3 Channel measurement 1 Timebase measurement Fig 3 9...
Страница 112: ...LAUNCH X431 GDS Scopebox Manual...
Страница 113: ...LAUNCH X431 GDS Scopebox Manual Fig 4 19...