Launch TLT235
、
TLT240 Economical Two-post User’s Manual
1
10. Installation .........................................................................................................15
10.1
I
MPORTANT NOTICE
............................................................................................................................. 15
10.2
I
NSTALLATION
P
ROCEDURE
................................................................................................................ 15
10.2.1 Selecting installation site ............................................................................................................ 15
10.2.2 Base plate layout.......................................................................................................................... 16
10.2.3 Install the power side column ..................................................................................................... 18
10.2.4 Install the floor plate, top beam .................................................................................................. 19
10.2.4.1 Install the top beam................................................................................................................... 19
10.2.4.2 Install the floor plate ................................................................................................................. 20
10.2.5 Install the offside column ............................................................................................................ 21
10.2.6 Install and adjust the balancing steel cables............................................................................. 21
10.2.7 Install the power unit and hydraulic lines .................................................................................. 22
10.2.8 Install the swing arm.................................................................................................................... 24
11. Lift Adjustment ..................................................................................................25
11.1
P
REPARATION BEFORE THE ADJUSTMENT
.......................................................................................... 25
11.2
A
DJUSTMENT PROCEDURE
.................................................................................................................. 25
12. List of the Lift components ..............................................................................26
Grease and hydraulic oil for lift..............................................................................41
Содержание TLT235
Страница 11: ...Launch TLT235 TLT240 Economical Two post User s Manual 4 Fig 1b Fig 1c...
Страница 12: ...Launch TLT235 TLT240 Economical Two post User s Manual 5 Fig 2a Fig 2b...
Страница 30: ...Launch TLT235 TLT240 Economical Two post User s Manual 23 Fig 14a...
Страница 34: ...Launch TLT235 TLT240 Economical Two post User s Manual 27 Applicable to TLT235SC U TLT235SC TLT240SC...
Страница 36: ...Launch TLT235 TLT240 Economical Two post User s Manual 29 Applicable to TLT235SB TLT240SB...
Страница 37: ...Launch TLT235 TLT240 Economical Two post User s Manual 30 Applicable to TLT235SB TLT240SB...
Страница 38: ...Launch TLT235 TLT240 Economical Two post User s Manual 31 Applicable to TLT235SC TLT240SC...
Страница 46: ...Launch TLT235 TLT240 Economical Two post User s Manual 39 1 packing 1 packing Domestic...
Страница 47: ...Launch TLT235 TLT240 Economical Two post User s Manual 40 2 packing 3 packing 4 packing Extension column...