
- 15 -
CONNECTION TO THE LOAD CELL
DIRECT CONNECTION
-
Cut the load cell cable approximately
90 mm from the cable gland;
-
strip the cable for about 45 mm;
-
roll up the shielding braid until a wire is
obtained;
-
electrically isolate the metal elements
in the cable to avoid short circuits
inside the instrument;
-
strip the wires end;
-
while holding the cable in place, screw
the cell nut up to the stop (max ½ turn);
-
screw the supplied LCB nut onto the
load cell cable gland;
-
wrap the Teflon tape around the thread
of the load cell cable gland;
-
remove the instrument cover;
-
screw the instrument onto the load cell
cable gland;
45 mm
90 mm
CELL NUT
LCB NUT
Содержание LCB
Страница 1: ...ENGLISH ENGLISH ENGLISH ENGLISH Installation Instructions version 1 02 LCB...
Страница 21: ......
Страница 22: ......
Страница 23: ......