CONNECTING SEVERAL CELLS IN PARALLEL
Connect several cells in parallel by using - if necessary - a watertight junction box with terminal box.
The cell connection extension cables must be shielded, led individually into their piping or conduit
and laid as far as possible from the power cables (in case of 4-wire connections, use cables with
4x1 mm
2
minimum cross-section).
PROTECTION OF THE CELL CABLE
Use water-proof sheaths and joints in order to protect the cables of the cells.
MECHANICAL RESTRAINTS (pipes, etc.)
When pipes are present, we recommend the use of hoses and flexible couplings with open
mouthpieces with rubber protection; in case of hard pipes, place the pipe support or anchor bracket as
far as possible from the weighed structure (at a distance at least 40 times the diameter of the pipe).
WELDING
Avoid welding with the load cells already installed. If this cannot be avoided, place the welder ground
clamp close to the required welding point to prevent sending current through the load cell body.
WINDY CONDITIONS - KNOCKS – VIBRATIONS
The use of weigh modules is strongly recommended for all load cells to compensate for
misalignment of the support surfaces. The system designer must ensure that the plant is protected
against lateral shifting and tipping relating to: shocks and vibration; windy conditions; seismic
conditions in the installation setting; stability of the support structure.
Содержание LCB
Страница 1: ...ENGLISH ENGLISH ENGLISH ENGLISH Installation Instructions version 1 02 LCB...
Страница 21: ......
Страница 22: ......
Страница 23: ......