© Elektronik-Systeme LAUER GmbH & Co. KG • Kelterstr. 59 • 72669 Unterensingen • Tel. 07022/9660-0 • Fax 07022/9660-103
9
1
Preparation
1.1
list hof supplied equipment
The transport cardboard box contains the following parts and materials:
CD with operating system.
Driver software CD for all pre-installed components like mother board,
touch, key board etc. Further information will be found in chapter
„installation“.
1 standard power cable ( European or US standard) length approx. 1,9m
Notice! The Power-cable is NOT delivered at the DC-Version.
User manual
Notice! Separate documentation of third party components is included on
the enclosed CD. This manual only describes specific information about
LAUER products – not about third party components.
The LAUER appliance pass is supplied with every appliance. It contains
important information for the user. Ready to hand are important address
data, serial number, then there are the components and type designation
corresponding with the company internal appliance designation.
Also shown are all components contained in the system – therefore the
CPU and hard disk type or the operation system are easily identifiable for
the user.
Your advantages:
•
all important contact data for a fast and uncomplicated handling for
desired improvements, general queries or for service purposes.
•
complete configuration of your system including serial number.
Fixing kit
Varying numbers of screws are contained in the parcel depending on the
appliance.
EPC PM 1200 - 8 nuts with toothed washers and plain washers
EPC PM 1500 - 10 nuts with toothed washers and plain washers
EPC PM 1700 - 14 nuts with toothed washers and plain washers
EPC PM 2100 - 14 nuts with toothed washers and plain washers