© Elektronik-Systeme LAUER GmbH & Co. KG • Kelterstr. 59 • 72669 Unterensingen • Tel. 07022/9660-0 • Fax 07022/9660-103
19
3.3
Assembly
Assembly
The EPC PM is to be inserted in a HF close housing or switchgear
cabinet made of metal
To dissipate the heat generated in the appliance a free space for air
circulation, of 100 mm has to be provided around the appliance!
The assembly takes place by hexagon nuts or retaining blocks (depending
upon the version of the EPC PM)
Notice!
Possibility of damage to the appliance!
Protection class IP65 to the front panel is only guaranteed with a perfect
fitting seal.
Pay attention to the torque when fixing the front panel!
3
Putting in to operation