Fig. 2: Unpacking instructions
7.
Fig. 2: Remove the ring bolts from the packaging.
8.
Fig. 4: Screw the two ring bolts all the way into the thread connection
Ç
(M10 or M16) on the top of the casing. Turn them clockwise to do
so.
Fig. 3: Ring bolt (example)
V6
Integral Process Thermostats and High-Temperature Thermostats
18 / 198
Содержание IN 130 T
Страница 89: ...6 3 Menu structure Fig 45 Menu Part 1 V6 Integral Process Thermostats and High Temperature Thermostats 89 198...
Страница 182: ...15 9 Declaration of Conformity and certificates V6 Integral Process Thermostats and High Temperature Thermostats 182 198...
Страница 183: ...Fig 99 Declaration of Conformity V6 Integral Process Thermostats and High Temperature Thermostats 183 198...
Страница 184: ...Fig 100 Declaration of Conformity V6 Integral Process Thermostats and High Temperature Thermostats 184 198...
Страница 186: ...V6 Integral Process Thermostats and High Temperature Thermostats 186 198...
Страница 187: ...V6 Integral Process Thermostats and High Temperature Thermostats 187 198...
Страница 199: ......