IND-HVAC-DTW-UVC-R1-SS series
INSTALLATION
UNIT PLACEMENT
•
Proper unit placement is essential. To ensure safe and effective operation, the location should:
•
Have enough duct width to mount unit with lamps perpendicular to airflow, within the longest duct length
for increased exposure time.
•
Be able to support the weight of the unit. If the duct construction does not seem capable of supporting the unit, the
duct must be re-enforced, to support the weight, before installing.
•
Be on the supply air plenum,
LOCATION A
(preferred), or on the return air plenum,
LOCATION B
(alternative).
•
Not be mounted under any source of moisture or condensation, such as humidifiers, cooling coils, etc.
•
Not be mounted near any duct openings, joints, seams, etc. If necessary, seal all openings, joints, seams, etc.
using aluminum tape or equivalent ultraviolet resistant material.
•
Prevent exposure of any plastic, rubber or other non-metallic materials, with inadequate resistance to ultraviolet,
such as; plastic drain pans, wiring insulation, flex ducts, humidifiers, filters etc. If necessary, shield all plastic,
rubber or other non-metallic materials using aluminum tape, conduit, sheet metal or equivalent ultraviolet resistant
material.
•
Be free of any components that would be damaged by or interfere with the installation.
•
Be easily accessible and allow enough clearance for routine cleaning or maintenance.
•
Be downstream from air filters. Dust particles reduce the effectiveness of the unit.
•
Other mounting positions and locations are possible; contact factory for any questions regarding this.
Larson Electronics, LLC
Phone: (800) 369-6671
Fax: (903) 498-3364
www.larsonelectronics.com
5
of
10
Figure 1 – Unit Placement