![Larius OMEGA 5:1 Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/larius/omega-5-1/omega-5-1_manual_3692867043.webp)
ED.
01 - 09/2022 - Cod. 150206
www.larius.com
43
OMEGA 5:1
H
Fig 2H
Fig 1H
From customer suplply aur
From customer supply
product
Material input
Air regulation filter
Air supply shut-off valve
Material outlet
IT
EN
TYPICAL INSTALLATION
The figure (
2H
) shows a typical installation with all the recommended accessories for the pump to operate correctly.
It is recommended to install an air supply shut-off valve (to be closed at the end of the work).
The
OMEGA 5:1
pump is generally supplied on support for wall fastening or on trolley or on double post ram.
For the correct fastening of the pump on other structures use the 4 holes placed at the base of the pneumatic motor (See the
illustration for dimensions).
45°
45°
ø 266
ø 240