![Lange Originals HOIST-A-TOP JT CRANK Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/lange-originals/hoist-a-top-jt-crank/hoist-a-top-jt-crank_manual_3546804005.webp)
Hint:
It may be easier to put in the screws when the wheels are
removed
Ceiling
P
erpendicular
S
tud
I
nstalla
�
on
Determine if your studs run
perpendicular or
p
arallel
with your garage door. If
your studs run p
arallel
to (or
the
same
direc
�
on
)
as your
garage door
go to the next
page
.
1.
Use the remaining 3.5"
screws (HAT-050) to
place cross bracing 2
x
6.
2.
With the
1.5"
screws
(HAT-125)
provided,
mount the
double
pulley
(HAT-118)
and
one of
the
single
pulleys
(HAT-116)
centered
with the
crank unit
and hardtop
.
3.
Mount the second
single pulley
(HAT-116
& HAT-125)
½ inch le
�
of center on the 2x6.
This will allow the
second cable to run
along the ceiling
without interfering
with the other cable.
½ inch le
�
of center
3 inches
Call toll free 1866 284 7428
langeoriginals.com copyright
lange originals 2017
Garage door