![Lange Originals HOIST-A-TOP JT CRANK Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/lange-originals/hoist-a-top-jt-crank/hoist-a-top-jt-crank_manual_3546804012.webp)
Installing the cable
Unclip the wire bundle and
stretch out the wire. The
cable is 43 feet in total. 23
feet for th
e left
side of the
drum and
20
feet for the
right
side
drum.
Mark the cable at the 23
foot
line with a marker or
piece of
tape. Center your
mark in
one of the holes
and lace one
of each
side of
the cable
through
two holes. You
should
finish
with the
longer
cable
on the
left
side of the
spool.
Loop both wire ends
through
the double pulley
in
the
corner of the ceiling.
Take
care that the cables
don’t
cross and that the
long
side
stays on the
left
pulley
and
the shorter side
stays
on the
right.
Pull the
side cable ( the
shorter cable) through the
middle single pulley in the
ceiling. This line will be for
the rear of the li
�i
ng frame.
Pull the
left
side cable (the
longer cable) through the
front pulley (this should be
the pulley that was
installed
½ inch le
�
of
center) This
cable will
a
�ac
h to the front
of the
li
�
ing frame.
A�
ach the cables to the
front and rear using the
wire
thimbles and clamps.
Use
the farthest back hole
for
the second li
�
ing point.
See
the next page for details
Call toll free 1866 284 7428
langeoriginals.com copyright
lange originals 2017