© 1997 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
10
Document #12382100
114261 Offset Hanger Clamp Assembly
PlayBooster
10-3-97
12382100
Offset Hanger
Clamp Assembly
The Offset Hanger Clamp allows
rails to be installed at same height
for special applications, like at 90
o
to each other as shown, or when
there are clamp conflicts, offset
can be positioned upward.
NOTE: A drive rivet is not required in all
applications. See Drive Rivet Addendum
for a listing of components that do not re-
quire drive rivets.
1
/
4
" x
5
/
8
"
Drive Rivet
DETAIL
ASSEMBLED CLAMP
Typical
Post
Rails At
Same
Height
5" Half
Clamp
(2)
3
/
8
" x 1
1
/
8
"
BHCS w/Pin
(2)
3
/
8
" Tee Nuts
5
/
8
" x 2
1
/
4
"
BHCS w/Pin
Offset Hanger Clamp
NOTE: Position with offset fac-
ing down as shown. See De-
tail for special applications.
Rail
R
SAFETY NOTE
Choose a protective surfacing material that
has a Critical Height Value of at least the
height of the Highest Accessible Part/Fall
Height of the adjacent equipment. (Ref. ASTM
F1487.)
Содержание PlayBooster Pod Climber 156916
Страница 1: ...MEO13207 Install...
Страница 2: ......
Страница 3: ...MODEL NUMBERS NOT FOUND 117957A...
Страница 4: ......
Страница 10: ......
Страница 16: ......
Страница 22: ......
Страница 24: ......
Страница 28: ......
Страница 30: ......
Страница 44: ......
Страница 46: ......
Страница 52: ......
Страница 60: ......
Страница 64: ......
Страница 70: ......
Страница 80: ......
Страница 86: ......
Страница 94: ......
Страница 106: ......