background image

 

 

Tel: 
Internet: 

1800 28 44 46 
www.carecompany.com.au 
 

 
 
 
Page 5/7 

 

Manual 

 ARZ Decontamination showers 

 

©2021 

 

Version 02 

 

 

3.5 Pictures of Inflation Process 
 

 

 

 

 

 

 

Couplings 

Suction hose 

 

Содержание care ARZ Decon

Страница 1: ...ata 2 3 Set up Instructions 3 3 1 Unpacking and unfolding 3 3 2 Inflating 3 3 2 1 Using the hand Pump 3 3 2 2 Using the Electrical Blower 3 3 3 Final Work to do 4 3 4 Important Information 4 3 5 Pictu...

Страница 2: ...cabin Electric fan Extra Hand shower Tub fixed to the shower 2x2m or 2x3m Reinforced windows 2 Technical Data Changes in the construction and fabric change weight and packing volume ARZ Decon 2x2m ARZ...

Страница 3: ...ve is closed The valve inside must be even with the valve surface c Close opened valve by pushing down and turning the valve tappet clockwise d Fill the tube system with air Lifting the shower air tub...

Страница 4: ...lectrical blower longer than needed for the inflation process may cause overheating Do not use continually for more than 5 minutes to avoid overheating 3 3 Final Work to Do a Fix shower with T pegs 30...

Страница 5: ...Tel Internet 1800 28 44 46 www carecompany com au Page 5 7 Manual ARZ Decontamination showers 2021 Version 02 3 5 Pictures of Inflation Process Couplings Suction hose...

Страница 6: ...s to open The air needs about 5 to 10 minutes to exhaust completely d Exhaust the air thoroughly with the hand pump or electrical blower 4 2 Folding and Packing a Spread out shower roof even and flat...

Страница 7: ...valves the same way as above In case that a valve is not airtight anymore please follow step 5 4 5 3 Repairing of Holes and Fissures Repairing of holes and fissures at the shower frame groundsheet or...

Отзывы: