background image

 

 

Tel: 
Internet: 

1800 28 44 46 
www.carecompany.com.au 
 

 
 
 
Page 6/7 

 

Manual 

 ARZ Decontamination showers 

 

©2021 

 

Version 02 

 

 

 

 

4. Deflation and Packing of the Shower 

4.1 Deflation 
 

a)  Take out everything of the shower. 

b) Take especially care of removing little stones, loose chippings 

and sharp objects. 

c)  Press down and turn anticlockwise in- for the deflation valves to 

open. The air needs about 5 to 10 minutes to exhaust completely. 

d) Exhaust the air thoroughly with the hand-pump or electrical 

blower. 

 

4.2 Folding and Packing 
 

a)  Spread out shower roof even and flat. 
b)  Loosen all fixtures. Lay guy ropes on the shower. 
c)  Collect all pegs, clean and pack them. 
d)  Fold shower as clean as is possible. 
e)  Roll in shower and squeeze out the remaining air with your knees. 
f)  Close valves and put on protective caps. 
g)  Place the packing bag under the end of the folded shower and roll it 

into the bag. 

h)  Pack all accessories. 

 

Содержание care ARZ Decon

Страница 1: ...ata 2 3 Set up Instructions 3 3 1 Unpacking and unfolding 3 3 2 Inflating 3 3 2 1 Using the hand Pump 3 3 2 2 Using the Electrical Blower 3 3 3 Final Work to do 4 3 4 Important Information 4 3 5 Pictu...

Страница 2: ...cabin Electric fan Extra Hand shower Tub fixed to the shower 2x2m or 2x3m Reinforced windows 2 Technical Data Changes in the construction and fabric change weight and packing volume ARZ Decon 2x2m ARZ...

Страница 3: ...ve is closed The valve inside must be even with the valve surface c Close opened valve by pushing down and turning the valve tappet clockwise d Fill the tube system with air Lifting the shower air tub...

Страница 4: ...lectrical blower longer than needed for the inflation process may cause overheating Do not use continually for more than 5 minutes to avoid overheating 3 3 Final Work to Do a Fix shower with T pegs 30...

Страница 5: ...Tel Internet 1800 28 44 46 www carecompany com au Page 5 7 Manual ARZ Decontamination showers 2021 Version 02 3 5 Pictures of Inflation Process Couplings Suction hose...

Страница 6: ...s to open The air needs about 5 to 10 minutes to exhaust completely d Exhaust the air thoroughly with the hand pump or electrical blower 4 2 Folding and Packing a Spread out shower roof even and flat...

Страница 7: ...valves the same way as above In case that a valve is not airtight anymore please follow step 5 4 5 3 Repairing of Holes and Fissures Repairing of holes and fissures at the shower frame groundsheet or...

Отзывы: