Tel:
Internet:
1800 28 44 46
www.carecompany.com.au
Page 6/7
Manual
–
ARZ Decontamination showers
©2021
Version 02
4. Deflation and Packing of the Shower
4.1 Deflation
a) Take out everything of the shower.
b) Take especially care of removing little stones, loose chippings
and sharp objects.
c) Press down and turn anticlockwise in- for the deflation valves to
open. The air needs about 5 to 10 minutes to exhaust completely.
d) Exhaust the air thoroughly with the hand-pump or electrical
blower.
4.2 Folding and Packing
a) Spread out shower roof even and flat.
b) Loosen all fixtures. Lay guy ropes on the shower.
c) Collect all pegs, clean and pack them.
d) Fold shower as clean as is possible.
e) Roll in shower and squeeze out the remaining air with your knees.
f) Close valves and put on protective caps.
g) Place the packing bag under the end of the folded shower and roll it
into the bag.
h) Pack all accessories.