background image

PAGE 8

Disinfection Procedure:

UV disinfection is a physical disinfection process and does not add any potentially harmful chemicals to the water. As 

UV does not provide a disinfection residual, it is imperative that the entire distribution system located after the UV be 

chemically disinfected to ensure that the water is free from any bacteriological contaminants. The disinfection process 

must be performed immediately after the UV unit is installed and repeated thereafter whenever the UV is shut down 

for service, without power, or inoperative for any reason. The procedure for sanitizing the plumbing system is readily 

accomplished as follows:
1.  Shut off the upstream water supply that feeds water into the reactor chamber and depressurize water system. 

Remove the pre-filter cartridge and fill the sump with 1-2 cups of household (5.25%) bleach (chlorine) - Do NOT use 

hydrogen peroxide. At all times during this process, make sure the UV unit (and lamp) is turned on and operational!

2.  Repressurize water system, open each faucet and allow cold water to run until you smell chlorine, shut the faucet 

off and then repeat the process for each faucet, including hot water. You must ensure that all taps, including outside 

faucets, dishwasher, shower heads, washing machines, connection to refrigerators, toilets, etc., pass chlorinated 

water.

3.  Once all the locations have passed the chlorine disinfection solution, you will need to leave the solution sit for a period 

of 20-30 minutes. Reinstall the pre-filter cartridge into the filter, and then flush the chlorine solution from the system 

until no chlorine smell is detectable. Make sure that each fixture that was disinfected in step two is completely flushed 

of the chlorine solution as the consumption of the water is not advised due to the extremely high concentrations of 

chlorine. It is important to remember that in the event that a UV is briefly shut down for a routine cleaning or during 

power interruptions where water could have passed through the system, the aforementioned procedure must also be 

followed.

Note A: The addition of chlorine (bleach) to a hot water tank that has in the past been fed with untreated raw water with 

high levels of other contaminants (iron, manganese, hydrogen sulphide, organics, etc.) will result in oxidation of these 

contaminants and may require repeated flushing of the hot water tank. This contingency must be dealt with independently 

under the start-up procedure for any other conditioners that may form a part of the pre-treatment for the UV unit. 

Note B: The above procedure (Steps 1 to 3) will result in a massive chlorine residual far in excess of the 0.5 to1.0 mg/L 

typically present in municipally chlorinated water and of a magnitude consistent with the minimum 50mg/L chlorine  

solution recommended for the disinfection of distribution systems known to be contaminated. Do not consume water until 

complete system has been flushed.
• Always disconnect power before performing any work on the disinfection system.
• Regularly inspect your disinfection system to ensure that the power indicators are on and no alarms are present.
• Replace the UV lamp annually (or biennially if seasonal home use ) to ensure maximum disinfection.
• Always drain the UV chamber when closing a seasonal home or leaving the unit in an area subject to freezing

  temperatures.

Содержание 7-LWT-UV009

Страница 1: ...RTIFIED PLUMBER IS RECOMMENDED In the event that you need assistance for servicing your UV system please first contact the professional contractor who installed the system Congratulations on purchasing your new Lancaster Water UV Disinfection System This unit is designed to give you many years of trouble free service For servicing and future inspection purposes please file this booklet with your i...

Страница 2: ...rforming any cleaning or maintenance activities Never yank the cord to remove from an outlet grasp the wall plug and pull to disconnect 8 Do not use this disinfection system for other than intended use potable water application The use of attachments not recommended or sold by the manufacturer distributor may cause an unsafe condition 9 Intended for indoor use only Do not install this disinfection...

Страница 3: ...t a lower performance than intended Qty 2 21S UV Electronic Ballast Mounting Screw Qty 2 21A UV Electronic Ballast Mounting Anchor Ground Screw attached Model SS UV Chamber Domed Quartz Sleeve length 7 LWT UV009 7 LWT UV016 7 LWT UV030 100 UV 200 UV 300 UV 7 Q6 13 1 8 7 Q10 21 3 8 7 Q20 34 3 4 UV Lamp A Four pins 7 L6 11 13 16 7 L10 20 1 16 7 L20 33 3 16 18 UV Lamp Compression Spring 14 UV Aluminu...

Страница 4: ...ONIC BALLAST CONTROLLER MODEL 7 LWT UV009 7 LWT UV016 7 LWT UV030 INLET OUTLET A B C D E F DIA 1 0 MNPT 1 0 MNPT 1 5 MNPT 3 1 2 3 1 2 3 1 2 5 17 3 8 13 3 8 1 3 8 13 9 16 5 25 5 8 21 11 16 21 13 16 1 3 8 5 1 4 2 1 8 39 3 4 35 1 16 35 9 16 C l i c k t o b u y N O W PDF XCHANGE w w w docu track c o m C l i c k t o b u y N O W PDF XCHANGE w w w docu track c o m ...

Страница 5: ...ctor POWER CONSUMPTION 34 W 29 W 45 W 50 W 90 W 80 W LAMP WATTS LAMP TYPE LOW PRESSURE HIGH OUTPUT LPHO ELECTRICAL MAXIMUM OPERATING PRESSURE 125 PSI AMBIENT AIR WATER TEMPERATURE 36 to 104 F PRESSURE DROP at 30mJ cm RATED FLOW 2 LESS THAN 1 PSI CHAMBER MATERIAL 304 SS INLET OUTLET PORT SIZE 1 0 MNPT 1 0 MNPT 1 5 MNPT STEADY WORK GREEN LED LAMP ON INDICATOR LAMP LIFE REMAINING DAYS CONTINUES TO BE...

Страница 6: ...llation is vertical with the lamp connector on top This is to prevent water damage from occurring on the lamp connector and lamp pins Leave space at least equal to the overall length of the disinfection system to allow clearance for the removal and replacement of the lamp and or quartz sleeve The electronic ballast should be mounted either above or beside the stainless steel UV reactor chamber Nev...

Страница 7: ...y Ensure that the flow of the water matches the flow direction as indicated on the flow restrictor DO NOT SOLDER CONNECTIONS WHILE ATTACHED TO THE SYSTEM AS THIS COULD DAMAGE THE O RING SEALS 5 Mount the electronic ballast controller horizontally to the wall near the UV reactor chamber Ideally place the controller above the reactor and away from any water connection point to prevent any water from...

Страница 8: ...rom the system until no chlorine smell is detectable Make sure that each fixture that was disinfected in step two is completely flushed of the chlorine solution as the consumption of the water is not advised due to the extremely high concentrations of chlorine It is important to remember that in the event that a UV is briefly shut down for a routine cleaning or during power interruptions where wat...

Страница 9: ...TER LAMP REPLACEMENT PG 9 refer to www lamprecycle org for lamp disposal QUARTZ SLEEVE REPLACEMENT CLEANING Mineral deposits and sediment may accumulate on the quartz sleeve decreasing the UV light transmittance and system performance Good maintenance of filtration equipment will reduce the accumulation of residues If necessary remove the quartz sleeve and clean with a commercially available scale...

Страница 10: ...und again if the lamp has not been replaced The alarm can be silenced up to 4 times 28 days After 4 times the alarm can no longer be silenced until a replacement lamp is installed and the lamp life timer is reset RESET LAMP LIFE TIMER AFTER LAMP REPLACEMENT After replacing the lamp by following instructions on the previous page reset the lamp life timer to 365 days by pressing and holding the butt...

Страница 11: ...OUND SCREW UNDER BALLAST U CLIP BUSHING LAMP CONNECTOR ALUMINUM GLAND NUT LAMP COMPRESSION SPRING O RING QUARTZ SLEEVE GROUND NUT UV LAMP GROUND WIRE RING TERMINAL STAINLESS STEEL UV CHAMBER QUARTZ SLEEVE DOMED END Refer to PRODUCT OVERVIEW page for replacement part numbers GROUND WIRE FORK TERMINAL ...

Страница 12: ...emperature Excessive Heat Generated Water temperature is too high Ensure treatment is on cold water side only prior to heating of water Water Appears Milky Caused by air in the water lines run water until air is purged Unit Leaking Water Problem with o ring seal on gland nut ensure o ring is in place check for cuts or abrasions clean o ring moisten with water and re install replace if necessary Co...

Страница 13: ...PAGE 13 A DIVISION OF C B TOOL CO 1340 MANHEIM PIKE LANCASTER PA 17601 3196 TEL 717 397 3521 FAX 717 392 0266 www lancasterwatergroup com E mail info lancasterwatergroup com 3 18 ...

Отзывы: