background image

PAGE 1

INSTALLATION, OPERATING AND SERVICE MANUAL 

FOR 

LANCASTER ULTRAVIOLET DISINFECTION SYSTEMS

PLEASE CAREFULLY READ INSTRUCTIONS BEFORE INSTALLING SYSTEM

FOLLOW ALL STATE AND LOCAL CODES AND REGULATIONS FOR PLUMBING AND ELECTRICAL.

INSTALLATION BY A CERTIFIED PLUMBER IS RECOMMENDED.

In the event that you need assistance for servicing your UV system, please first contact the 

professional contractor who installed the system.

Congratulations on purchasing your new 

Lancaster Water UV Disinfection System

. This unit is 

designed to give you many years of trouble free service. For servicing and future inspection purposes, 

please file this booklet with your important documents.

  7-LWT-UV009
  7-LWT-UV016
  7-LWT-UV030

Содержание 7-LWT-UV009

Страница 1: ...RTIFIED PLUMBER IS RECOMMENDED In the event that you need assistance for servicing your UV system please first contact the professional contractor who installed the system Congratulations on purchasing your new Lancaster Water UV Disinfection System This unit is designed to give you many years of trouble free service For servicing and future inspection purposes please file this booklet with your i...

Страница 2: ...rforming any cleaning or maintenance activities Never yank the cord to remove from an outlet grasp the wall plug and pull to disconnect 8 Do not use this disinfection system for other than intended use potable water application The use of attachments not recommended or sold by the manufacturer distributor may cause an unsafe condition 9 Intended for indoor use only Do not install this disinfection...

Страница 3: ...t a lower performance than intended Qty 2 21S UV Electronic Ballast Mounting Screw Qty 2 21A UV Electronic Ballast Mounting Anchor Ground Screw attached Model SS UV Chamber Domed Quartz Sleeve length 7 LWT UV009 7 LWT UV016 7 LWT UV030 100 UV 200 UV 300 UV 7 Q6 13 1 8 7 Q10 21 3 8 7 Q20 34 3 4 UV Lamp A Four pins 7 L6 11 13 16 7 L10 20 1 16 7 L20 33 3 16 18 UV Lamp Compression Spring 14 UV Aluminu...

Страница 4: ...ONIC BALLAST CONTROLLER MODEL 7 LWT UV009 7 LWT UV016 7 LWT UV030 INLET OUTLET A B C D E F DIA 1 0 MNPT 1 0 MNPT 1 5 MNPT 3 1 2 3 1 2 3 1 2 5 17 3 8 13 3 8 1 3 8 13 9 16 5 25 5 8 21 11 16 21 13 16 1 3 8 5 1 4 2 1 8 39 3 4 35 1 16 35 9 16 C l i c k t o b u y N O W PDF XCHANGE w w w docu track c o m C l i c k t o b u y N O W PDF XCHANGE w w w docu track c o m ...

Страница 5: ...ctor POWER CONSUMPTION 34 W 29 W 45 W 50 W 90 W 80 W LAMP WATTS LAMP TYPE LOW PRESSURE HIGH OUTPUT LPHO ELECTRICAL MAXIMUM OPERATING PRESSURE 125 PSI AMBIENT AIR WATER TEMPERATURE 36 to 104 F PRESSURE DROP at 30mJ cm RATED FLOW 2 LESS THAN 1 PSI CHAMBER MATERIAL 304 SS INLET OUTLET PORT SIZE 1 0 MNPT 1 0 MNPT 1 5 MNPT STEADY WORK GREEN LED LAMP ON INDICATOR LAMP LIFE REMAINING DAYS CONTINUES TO BE...

Страница 6: ...llation is vertical with the lamp connector on top This is to prevent water damage from occurring on the lamp connector and lamp pins Leave space at least equal to the overall length of the disinfection system to allow clearance for the removal and replacement of the lamp and or quartz sleeve The electronic ballast should be mounted either above or beside the stainless steel UV reactor chamber Nev...

Страница 7: ...y Ensure that the flow of the water matches the flow direction as indicated on the flow restrictor DO NOT SOLDER CONNECTIONS WHILE ATTACHED TO THE SYSTEM AS THIS COULD DAMAGE THE O RING SEALS 5 Mount the electronic ballast controller horizontally to the wall near the UV reactor chamber Ideally place the controller above the reactor and away from any water connection point to prevent any water from...

Страница 8: ...rom the system until no chlorine smell is detectable Make sure that each fixture that was disinfected in step two is completely flushed of the chlorine solution as the consumption of the water is not advised due to the extremely high concentrations of chlorine It is important to remember that in the event that a UV is briefly shut down for a routine cleaning or during power interruptions where wat...

Страница 9: ...TER LAMP REPLACEMENT PG 9 refer to www lamprecycle org for lamp disposal QUARTZ SLEEVE REPLACEMENT CLEANING Mineral deposits and sediment may accumulate on the quartz sleeve decreasing the UV light transmittance and system performance Good maintenance of filtration equipment will reduce the accumulation of residues If necessary remove the quartz sleeve and clean with a commercially available scale...

Страница 10: ...und again if the lamp has not been replaced The alarm can be silenced up to 4 times 28 days After 4 times the alarm can no longer be silenced until a replacement lamp is installed and the lamp life timer is reset RESET LAMP LIFE TIMER AFTER LAMP REPLACEMENT After replacing the lamp by following instructions on the previous page reset the lamp life timer to 365 days by pressing and holding the butt...

Страница 11: ...OUND SCREW UNDER BALLAST U CLIP BUSHING LAMP CONNECTOR ALUMINUM GLAND NUT LAMP COMPRESSION SPRING O RING QUARTZ SLEEVE GROUND NUT UV LAMP GROUND WIRE RING TERMINAL STAINLESS STEEL UV CHAMBER QUARTZ SLEEVE DOMED END Refer to PRODUCT OVERVIEW page for replacement part numbers GROUND WIRE FORK TERMINAL ...

Страница 12: ...emperature Excessive Heat Generated Water temperature is too high Ensure treatment is on cold water side only prior to heating of water Water Appears Milky Caused by air in the water lines run water until air is purged Unit Leaking Water Problem with o ring seal on gland nut ensure o ring is in place check for cuts or abrasions clean o ring moisten with water and re install replace if necessary Co...

Страница 13: ...PAGE 13 A DIVISION OF C B TOOL CO 1340 MANHEIM PIKE LANCASTER PA 17601 3196 TEL 717 397 3521 FAX 717 392 0266 www lancasterwatergroup com E mail info lancasterwatergroup com 3 18 ...

Отзывы: